Rio Taquesi Hydroelectric Power Project

VCS-2089 ↗

5.6 / 10
Integrity
5.2
Transparency
6.1
Claim Safety
5.0
Documentation
7.0

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.

missing Leakage is not addressed and no leakage deduction is stated in the monitoring report, and baseline reassessment timing is not stated in the extracted record.

Transparency

verified A named VVB (SGS United Kingdom Ltd) and a clearly stated monitoring period (2011-03-01 to 2012-06-30) support MRV traceability.

missing Key quantitative fields are missing or inconsistent, including claimed vs verified ERs and missing baseline reassessment year.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing certain downstream double-claiming/eligibility risks.

missing Over-crediting risk is elevated by the mismatch between claimed and verified ERs and by the lack of explicit leakage treatment.

Documentation

verified Multiple core documents are present (monitoring report, validation report, PDD, issuance) and extraction confidence is high.

missing Contradictions between documents (crediting period; safeguards mention) indicate documentation coherence issues.

Detailed Analysis

Integrity

The monitoring/verification record indicates additionality was confirmed by the VVB using an investment test (validation/verification documentation referenced in the extracted record). The baseline is described as project-specific (extracted record), but the timing of any baseline reassessment is not stated in available documents, which weakens confidence in baseline validity over time. Leakage is explicitly noted as not addressed in the monitoring report (2012), and no leakage deduction is stated, which is a substantive integrity gap for credit quantification.

Transparency

The monitoring report (2012-10-24) provides a defined monitoring period (2011-03-01 to 2012-06-30) and identifies the VVB as SGS United Kingdom Ltd, supporting audit traceability. However, the extracted record shows a major inconsistency between claimed and verified emission reductions (249,802 claimed vs 286,328 verified), which reduces transparency on how figures were derived and reconciled. Several MRV-relevant fields (e.g., grid EF year, usage monitoring method) are not stated in the extracted record.

Claim Safety

The project is explicitly not CORSIA-eligible (extracted record), which lowers the risk of certain aviation-related claims and associated double-claiming narratives. Nonetheless, the mismatch where verified ERs exceed claimed ERs (monitoring/issuance figures in the extracted record) increases perceived over-crediting and reporting risk for external claims. Leakage being not addressed in the monitoring report (2012) further increases greenwashing risk because stakeholders cannot see how potential upstream/downstream effects were handled.

Documentation

The evidence set includes key document types (monitoring report, validation report, PDD, issuance) with high extraction confidence, supporting a relatively strong documentation score. No material findings or corrective actions are reported in the extracted record, which is a positive signal for audit outcomes. However, contradictions across documents (crediting period and whether safeguards are mentioned) indicate that the documentation is not fully coherent and requires reconciliation.

Overall

Overall scoring is pulled down primarily by (1) leakage not being addressed in the monitoring report (2012) and (2) internal inconsistencies in the extracted record. For the safeguards contradiction (monitoring report says safeguards not mentioned; PDD says safeguards mentioned), the PDD (2013-02-06) is more specific to project design disclosures, so it is privileged for whether safeguards are at least discussed, but the absence of FPIC and a grievance mechanism in the extracted record still indicates weak safeguards implementation. For the crediting period contradiction (monitoring report: 2009-07-01 to 2016-06-30; validation report: 2002-07-01 to 2009-06-30), the monitoring report period is privileged as it aligns with the stated monitoring period and later operational crediting context, but the discrepancy materially reduces confidence and warrants a score penalty for reliability. Note: gate rules may cap scores post-processing if documentation or integrity fall below thresholds.

Audit Analysis

This VCS hydropower project has VVB-confirmed additionality via an investment test and no reported material findings or corrective actions in the extracted record. However, leakage is not addressed, baseline reassessment timing is not stated, and key inconsistencies (notably the crediting period) reduce confidence in the reliability of the record and increase over-crediting risk.

Project Description

This carbon project, with the CDM Project ID 1031, converted units into VCUs in compliance with VCS requirements. For more details, please visit the project's page on the UNFCCC CDM website.

Red Flags

  • Verified ERs exceed claimed ERs for the same monitoring period (286,328 verified vs 249,802 claimed), which raises data consistency and over-crediting concerns.
  • Leakage is not addressed and no leakage deduction is stated, despite renewable energy projects often requiring explicit leakage treatment under the methodology.
  • Crediting period is inconsistent across documents (monitoring report vs validation report), undermining confidence in project boundary/eligibility timing.

Credit Vintages

Issued Retired Available
2011
50,000 48,750 1,250
Total 50,000 48,750 1,250

Cosa migliorerebbe questo punteggio

  • Provide an explicit leakage assessment consistent with ACM0002 (v8), including a quantified leakage deduction (even if 0%) with clear justification in the monitoring/verification documentation.
  • Reconcile and publicly clarify the crediting period discrepancy between the validation report (2009) and monitoring report (2012), and provide a clear baseline reassessment history (grid EF year/source and any updates).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversals reported

Leakage

Leakage not addressed

Baseline

Project-specific; reassessment timing unclear

Safeguards

No FPIC or grievance mechanism evidenced

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti