Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Safe Water Programme – Kenya – VPA 46

GS-3325 ↗ · current registry ID: GS11304

#478of 1329 in Industrial#55of 157 in Kenya#759of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Safe Water Programme in Kenya is a Gold Standard energy-efficiency project with VVB-confirmed additionality and conservative verified emissions reductions exceeding the claimed figure. However, the project carries multiple material findings with corrective actions, a project-specific baseline, no stated buffer pool, and seven inter-document contradictions that collectively undermine confidence in the robustness of the credit claims.

Red Flags

  • Four material findings (CAR#01, CAR#02, FAR#01, CL#01) with two corrective actions still required, including concerns about monitoring continuity and potential systemic bias in chlorine tablet usage
  • Reversal events explicitly marked as 'not addressed' in the verification record
  • Seven contradictions across documents, including inconsistent FNRB values (93.51 vs 0.9351), conflicting additionality test types (investment vs combined), and divergent usage-rate figures (0.965 vs 93.17)
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, and one monitoring report (March 2023) did not address leakage at all

Credit Vintages

IssuedRetiredAvailable
2021
20,75320,7530
2022
18,853018,853
2023
18,850018,850
2024
22,355022,355
Total80,81120,75360,058

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal not addressed

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; no reassessment date

Safeguards

FPIC, grievance, benefit-sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents