Sares 22.5 MW Wind Power Plant
GS-1279 ↗ · current registry ID: GS963
#789of 1935 in Renewable energy#161of 295 in Turkey#457of 1801 in Gold Standard (GS)#619of 1287 in ACM0002
Audit Analysis
The Sares 22.5 MW wind project in Turkey is a fundamentally sound avoidance-type renewable energy credit with VVB-confirmed additionality and no inherent reversal risk. However, the project record is marred by numerous material findings across multiple verification cycles, a significant FPIC contradiction between documents, and low extraction confidence, which collectively erode confidence in the data quality and documentation trail. The project is CORSIA-eligible and uses a conservative 2024 grid emission factor, but the absence of verified ERR figures and unresolved PDD calculation discrepancies introduce moderate over-crediting risk.
Red Flags
- FPIC status contradicts between the 2017 monitoring report (conducted) and the 2023 PDD (not conducted) — a material safeguard inconsistency
- The 2024 verification report flagged that the ex-ante PDD calculation is incorrect and that the difference between actual and estimated reductions for the 3rd monitoring period was not explained
- Multiple monitoring report data quality errors: net electricity figures not updated for the correct period, calculations not corresponding to the 3rd monitoring period, and grid emission factor omitted from the required MR section
- LSC process deficiencies: no female participants, invitations sent only one week before the meeting, and missing mitigation measures for wastewater and soil
- Total verified ERR is not available in the extracted record, preventing independent cross-check of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 53,793 | 53,793 | 0 | |
| 2012 | 51,325 | 51,325 | 0 | |
| 2013 | 50,663 | 50,663 | 0 | |
| 2014 | 44,042 | 44,042 | 0 | |
| 2015 | 45,807 | 45,807 | 0 | |
| 2021 | 32,355 | 0 | 32,355 | |
| 2022 | 54,878 | 0 | 54,878 | |
| 2023 | 20,337 | 0 | 20,337 | |
| Total | 353,200 | 245,630 | 107,570 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, negligible for grid displacement
Project-specific, reassessed 2024
FPIC contradiction; LSC gaps
CORSIA-eligible; CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →