Saros Wind Power Plant

GS-2645 ↗ · current registry ID: GS7801

#80of 1935 in Renewable energy#17of 295 in Turkey#26of 1801 in Gold Standard (GS)#54of 1287 in ACM0002

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

The Saros Wind Power Plant is a straightforward renewable energy avoidance project with VVB-confirmed additionality, a jurisdictional baseline, and no reversal risk. The 2025 verification report confirms ERR delivery at approximately 95% of the pro-rata expectation, indicating no over-crediting. However, the absence of FPIC, several unstated eligibility fields (CORSIA, CCP), and a set of 10 corrective actions related to documentation accuracy temper the overall assessment.

Red Flags

  • FPIC was not conducted despite the project being in Turkey, a country with indigenous and local community considerations
  • Seven contradictions across documents (leakage justification, baseline method, ERR figures, additionality test type, grievance mechanism, crediting period) indicate evolving project documentation that required multiple corrections
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2021
149,071149,00071
2022
328,2971,618326,679
2023
307,7580307,758
2024
121,7390121,739
Total906,865150,618756,247

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for grid-connected wind

Baseline

Jurisdictional but contradicted in 2024 report; grid EF from 2019

Safeguards

Grievance mechanism present, benefit sharing described, but no FPIC

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents