Sayan 14.896 MWe Small Scale Power Project, Turkey
GS-1701 ↗ · current registry ID: GS730
#247of 295 in Turkey#1194of 1801 in Gold Standard (GS)#427of 806 in AMS-I.D
Audit Analysis
The Sayan small hydro project in Turkey uses a jurisdictional baseline and a combined additionality test, which are structurally sound, but the verification report (May 2016) flags six corrective actions covering data discrepancies, missing meter calibrations, and incomplete environmental monitoring. The project delivered only about 73% of the pro-rata ex-ante expectation for the 2014–2015 monitoring period, and no buffer pool or permanence mechanism is documented. Overall, the project is a modest, low-impact hydro credit with meaningful data-quality caveats.
Red Flags
- Six corrective actions (CARs and CRs) in the 2016 verification report indicate unresolved data-quality issues in the monitoring spreadsheet, meter calibration, and environmental parameter calculations.
- Verified emissions reductions of 38,795 tCO2e represent only ~73% of the pro-rata ex-ante expectation (~53,146 tCO2e) for the 2-year monitoring period, suggesting the ex-ante estimate may have been optimistic.
- No buffer pool or permanence mechanism is documented in the extracted record, leaving reversal risk unaddressed.
- Grid emission factor of 0.5502 tCO2/MWh is from 2008 and has not been updated in the available documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 664 | 651 | 13 | |
| 2012 | 26,395 | 26,395 | 0 | |
| 2013 | 23,287 | 23,287 | 0 | |
| 2014 | 13,159 | 13,141 | 18 | |
| 2015 | 26,579 | 26,579 | 0 | |
| Total | 90,084 | 90,053 | 31 |
Risk Indicators
Combined test present; VVB confirmation not confirmed in extracted data
mixed evidence / unresolved risk
0% deemed negligible; reasonable for small run-of-river hydro
Jurisdictional method; grid EF from 2008; reassessment timing not stated
Safeguards and benefit-sharing mentioned; FPIC and grievance mechanism not confirmed
CORSIA and CCP statuses not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →