Sebenoba 30 MW Wind Farm
#278of 1935 in Renewable energy#62of 295 in Turkey#135of 1339 in Verra (VCS)#207of 1287 in ACM0002
Audit Analysis
The Sebenoba 30 MW Wind Farm is a VCS-registered renewable energy project with VVB-confirmed additionality and a jurisdictional baseline, delivering approximately 163% of the pro-rata ex-ante expectation for its monitoring period. However, a large discrepancy between the ex-ante lifetime estimate in the validation report (606,690 tCO₂e) and the verification report (236,858 tCO₂e), combined with 15 corrective action requests and low extraction confidence, temper confidence in the project's data reliability.
Red Flags
- Ex-ante lifetime ERR differs by a factor of ~2.6 between the 2010 validation report (606,690) and the 2022 verification report (236,858), with no documented explanation for the revision
- 15 Corrective Action Requests and 2 Clarification Requests were raised during verification, including incorrect reporting of electricity generated and missing calibration compliance evidence
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable or incomplete
- Grid emission factor is from 2004 (0.665 tCO₂/MWh) with no evidence of periodic updating
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 29,178 | 29,178 | 0 | |
| 2009 | 46,998 | 46,998 | 0 | |
| 2010 | 55,076 | 55,076 | 0 | |
| 2011 | 47,686 | 17,346 | 30,340 | |
| 2012 | 52,056 | 0 | 52,056 | |
| 2013 | 55,250 | 0 | 55,250 | |
| 2014 | 58,804 | 0 | 58,804 | |
| 2015 | 17,971 | 0 | 17,971 | |
| Total | 363,019 | 148,598 | 214,421 |
Risk Indicators
VVB-confirmed combined test
No reversal risk (wind, no storage)
0% deemed negligible, reasonable for wind
Jurisdictional, but reassessment timing not stated
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →