Selale HEPP
GS-1165 ↗ · current registry ID: GS729
#118of 295 in Turkey#288of 1801 in Gold Standard (GS)#443of 1287 in ACM0002
Audit Analysis
Selale HEPP is a small hydro project in Turkey with VVB-confirmed additionality and no material findings, but its baseline relies on a grid emission factor from 2007 that is now 18 years old, and the project delivered only about 41% of its pro-rata expected emissions reductions during the most recent monitoring period. Multiple contradictions across documents—particularly on baseline method, leakage justification, and the ex-ante ERR figure—reduce confidence in the data record, and the low extraction confidence further limits assurance.
Red Flags
- Grid emission factor of 562 gCO2/kWh is sourced from 2007 data, making the baseline potentially 18 years out of date and the per-kWh avoidance claim uncertain
- The project delivered only ~41% of the pro-rata expected ERR for the 16-month monitoring period (17,567 tCO2e vs. ~43,200 tCO2e expected), suggesting the ex-ante estimate may be overly optimistic or the plant is underperforming
- Eight contradictions were identified across documents, including conflicting baseline method (project-specific vs. jurisdictional), leakage justification (quantified vs. deemed negligible), and two different lifetime ERR figures (221,172 vs. 256,984 tCO2e)
- Reversal/permanence risk is explicitly 'not addressed' in the 2025 verification report, and no buffer pool percentage is stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 5,633 | 0 | 5,633 | |
| 2024 | 11,934 | 0 | 11,934 | |
| Total | 17,567 | 0 | 17,567 |
Risk Indicators
VVB-confirmed investment test
Avoidance project but reversal not addressed in verification report
0% deduction with quantified justification; reasonable for grid-connected hydro
Project-specific baseline; grid EF from 2007 is 18 years old; method contradicts PDD
FPIC conducted, grievance mechanism and benefit sharing documented
CORSIA eligibility not stated; CCP status not mentioned
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →