SERTAVUL WPP
GS-1897 ↗ · current registry ID: GS7497
#117of 295 in Turkey#286of 1801 in Gold Standard (GS)#442of 1287 in ACM0002
Audit Analysis
SERTAVUL WPP is a Gold Standard wind power project in Turkey with VVB-verified additionality (combined test) and no material findings or reversal events. However, five contradictions between the verification report, monitoring report, and PDD — most notably a 3.6× discrepancy in reported emissions reductions and conflicting baseline method labels — combined with low extraction confidence, create meaningful data-reliability concerns that temper an otherwise solid avoidance-credit profile.
Red Flags
- Emissions reduction figures differ by a factor of ~3.6 between the monitoring report (39,181) and the verification report (141,800), with no documented explanation for the gap
- Baseline method is labelled 'project' in the verification report but 'jurisdictional' in the monitoring report, creating ambiguity about the baseline construction
- Crediting period differs between the verification report (2021-07-01 to 2026-06-30) and the monitoring report (2020-11-01 to 2025-10-31), raising questions about which period governs credit issuance
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project being in a community-adjacent setting in Turkey
- Minimum extraction confidence across the document set is rated low, indicating at least one key document was poorly readable or incomplete
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 36,721 | 0 | 36,721 | |
| 2022 | 65,898 | 0 | 65,898 | |
| 2023 | 39,181 | 779 | 38,402 | |
| Total | 141,800 | 779 | 141,021 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, contradictory justification
Method label conflicts across documents
Grievance & benefit sharing present, FPIC absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →