Seyitali 30 MW Wind Farm Project, Turkey
GS-1011 ↗ · current registry ID: GS578
#525of 1935 in Renewable energy#106of 295 in Turkey#244of 1801 in Gold Standard (GS)#398of 1287 in ACM0002
Audit Analysis
The Seyitali 30 MW wind farm is a straightforward renewable-energy avoidance project with a VVB-confirmed combined additionality test and no inherent reversal risk. However, the verification process surfaced 18 corrective action requests and 35 clarification requests, local stakeholders were found unaware of the grievance mechanism, and several key parameters (FNRB, usage monitoring, CORSIA eligibility) are absent from the record. The project delivered 132% of the pro-rata lifetime expectation for the 2024 monitoring period, so over-crediting risk is low, but documentation quality and stakeholder engagement gaps temper the overall assessment.
Red Flags
- 18 Corrective Action Requests and 35 Clarification Requests were raised during verification, indicating significant monitoring-report deficiencies that had to be remediated before the VVB could issue its opinion.
- Local stakeholders in Atcılar Village were unaware of the project logbook and grievance mechanism during the on-site visit, despite FPIC being recorded as conducted in the validation report.
- The verification report and monitoring report disagree on the baseline method (project-specific vs. jurisdictional) and on the leakage treatment (quantified vs. deemed negligible), creating ambiguity about which approach was actually applied.
- Minimum extraction confidence across the 25 source documents is rated low, meaning at least one key document was poorly readable and some facts may be incomplete.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 32,006 | 32,006 | 0 | |
| 2012 | 50,010 | 50,010 | 0 | |
| 2013 | 29,703 | 29,703 | 0 | |
| 2023 | 35,032 | 0 | 35,032 | |
| 2024 | 56,265 | 0 | 56,265 | |
| Total | 203,016 | 111,719 | 91,297 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% quantified, appropriate for wind
Project-specific, cross-doc conflict
FPIC recorded but stakeholders unaware
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →