Shuangliao Solar PV Power Generation Project
GS-1328 ↗ · current registry ID: GS2534
#96of 1935 in Renewable energy#21of 1084 in China#34of 1801 in Gold Standard (GS)#35of 806 in AMS-I.D
Audit Analysis
A grid-connected solar PV project in China using the well-established AMS I.D. methodology, with VVB-confirmed additionality and a jurisdictional grid emission factor baseline. The project is an avoidance-type credit with minimal permanence risk, though several documentation gaps (verified ERR, FNRB, usage rate) and minor inter-document contradictions temper confidence. Overall a low-risk renewable energy project with moderate documentation completeness.
Red Flags
- Total verified ERR is not stated in any available document, preventing independent cross-check of claimed credits against verified figures
- Benefit-sharing description is contradicted between the PDD (described) and the validation report (not described), leaving the actual status unclear
- FNRB value and method are not stated in any document, creating a gap in the emissions accounting chain
- Grid emission factor is from 2017 and no updated value is referenced for the current monitoring period (2024)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 2,514 | 2,464 | 50 | |
| 2014 | 4,899 | 4,801 | 98 | |
| 2019 | 6,280 | 125 | 6,155 | |
| 2020 | 11,369 | 227 | 11,142 | |
| Total | 25,062 | 7,617 | 17,445 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Jurisdictional grid EF (2017), AMS I.D.
FPIC, grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →