Sibel WPP
GS-468 ↗ · current registry ID: GS2683
#130of 295 in Turkey#332of 1801 in Gold Standard (GS)#489of 1287 in ACM0002
Audit Analysis
The Sibel WPP is a Gold Standard wind project in Turkey with VVB-confirmed additionality and a jurisdictional baseline, but is undermined by a high volume of corrective actions (20 CARs/CLs), contradictory ERR figures between the monitoring and verification reports, and a low extraction confidence rating. The project's inherent low-risk profile as an avoidance-type wind installation is partially offset by documentation inconsistencies and a weakly justified 0% leakage deduction.
Red Flags
- 20 corrective actions and clarifications (CARs/CLs) were required during verification, including inconsistencies in turbine specifications, plant load factor, employment records, and environmental parameters — indicating significant data-quality issues in the project documentation.
- The monitoring report (Dec 2025) claims 148,204 tCO2e while the verification report (May 2025) verifies 276,630 tCO2e for what appears to be overlapping periods — a 86% discrepancy that is unexplained in the available documents.
- Leakage justification is contradictory: the verification report states leakage was 'not addressed' while the monitoring report claims it was 'deemed negligible,' with a 0% deduction applied in both cases.
- Low extraction confidence across the document set, meaning at least one key document was poorly readable, reducing reliability of the extracted data.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 6,690 | 30 | 6,660 | |
| 2023 | 121,736 | 300 | 121,436 | |
| 2024 | 148,204 | 152 | 148,052 | |
| Total | 276,630 | 482 | 276,148 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, justification inconsistent
Jurisdictional grid EF (2019)
Grievance & benefit sharing present, FPIC not conducted
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →