Silivri WPP
GS-729 ↗ · current registry ID: GS4264
#63of 295 in Turkey#109of 1801 in Gold Standard (GS)#208of 1287 in ACM0002
Audit Analysis
Silivri WPP is a Gold Standard wind power project in Turkey with a confirmed investment-test additionality assessment and inherently low reversal risk typical of wind. The project delivered roughly 89% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is within normal wind variability. However, the most recent verification report leaves leakage justification and reversal-event confirmation unaddressed, and the low extraction confidence across 20 documents introduces residual uncertainty.
Red Flags
- Leakage justification is recorded as 'not addressed' in the 2025 verification report, despite a 0% deduction being applied; the earlier 2022 report had stated it was 'deemed negligible', creating a documentation gap.
- Minimum extraction confidence across the 20 source documents is rated low, meaning at least one key document was poorly readable and some fields could not be reliably extracted.
- Eight contradictions were identified across documents, including conflicting baseline method descriptions (project-specific vs. jurisdictional) and inconsistent reversal-event reporting between the 2019 and 2025 verification reports.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 30,523 | 30,523 | 0 | |
| 2015 | 95,361 | 94,661 | 700 | |
| 2016 | 94,431 | 94,431 | 0 | |
| 2017 | 87,878 | 87,878 | 0 | |
| 2018 | 103,418 | 103,418 | 0 | |
| 2019 | 99,514 | 66,691 | 32,823 | |
| 2020 | 88,853 | 85,440 | 3,413 | |
| 2021 | 47,022 | 40,716 | 6,306 | |
| Total | 647,000 | 603,758 | 43,242 |
Risk Indicators
VVB-confirmed investment test
Wind – no storage, minimal reversal risk
0% deduction, justification not addressed in 2025 VR
Project-specific baseline; grid EF 0.5612 (2018)
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →