Sinop Landfill Gas to Electricity Project
#14of 189 in Methane#84of 295 in Turkey#201of 1339 in Verra (VCS)#2of 34 in AMS-III.G
Audit Analysis
The Sinop Landfill Gas to Electricity Project is a standard AMS-III.G methane recovery project with VVB-confirmed additionality and a reasonable baseline for its project type. The project delivered approximately 71% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating mild under-delivery but no over-crediting risk. Documentation is present but carries a notable number of editorial corrections and a medium extraction confidence, tempering overall confidence.
Red Flags
- FNRB value and method are not stated in the extracted record, creating a gap in the emission factor chain
- FPIC status is contradictory between the verification report (conducted) and the monitoring report (not conducted); the verification report is privileged as the higher-authority document
- 12 material findings and 13 corrective actions were identified in the verification report, mostly editorial but indicating quality-control weaknesses in the project documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 12,471 | 0 | 12,471 | |
| 2022 | 24,519 | 0 | 24,519 | |
| 2023 | 27,754 | 10,406 | 17,348 | |
| 2024 | 20,140 | 0 | 20,140 | |
| Total | 84,884 | 10,406 | 74,478 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deemed negligible, consistent with LFG-to-electricity
Project-specific, modeled; reassessment not yet due
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.