Skip to main content
UCRGujarat IndiaAMS-III.D

Small Scale Goshala Community Biogas Projects, Gujarat

UCR-13 ↗

#95of 111 in Biogas#28of 42 in Gujarat India#229of 421 in Universal Carbon Registry (UCR)#61of 62 in AMS-III.D

3.3/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
3.5
Documentation
2.5

Audit Analysis

This small-scale community biogas project in Gujarat has a reasonable project design with an investment additionality test and a national-default FNRB, but the evidentiary record is extremely thin — only a PDD is available, with no verification report, monitoring report, or named VVB. The 416,928 ERR claim over the 2014–2021 crediting period cannot be independently validated, and key integrity safeguards (buffer pool, permanence mechanism, detailed leakage justification) are absent from the extracted record.

Red Flags

  • No verification report or monitoring report found in the extracted record; only a PDD is available, making the 416,928 ERR claim unverifiable
  • No VVB is named and additionality is not confirmed by an independent verifier
  • No buffer pool or permanence mechanism is documented for a project with an 8-year crediting period
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantitative support
  • Project-specific baseline with no record of reassessment

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Investment test present but not VVB-confirmed

Permanence

No buffer pool or permanence mechanism documented

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment record

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20AMS.I.E, AMS-III.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents