Small-scale solar electrical programme, South Africa – CPA-004
GS-4115 ↗ · current registry ID: GS11999
#24of 59 in South Africa#983of 1801 in Gold Standard (GS)#19of 44 in AMS-I.F
Audit Analysis
A 77 MWp small-scale solar programme in South Africa verified under Gold Standard with a recognised methodology (AMS-I.F.) and a jurisdictional baseline, but the project record is severely undermined by 14 cross-document contradictions on core parameters (additionality status, baseline method, ERR totals, FPIC, crediting period) and a low extraction confidence rating. The project is underperforming relative to ex-ante estimates (one VPA at one-third of expected output), and key permanence and double-claiming data are absent.
Red Flags
- 14 contradictions across documents on core parameters including additionality verification status, baseline method, ERR totals, FPIC, and crediting period — the 2026 verification report and 2024 verification report directly disagree on whether additionality was VVB-verified and on the baseline method (jurisdictional vs project-specific)
- Six different ERR totals appear across documents (96,371 / 96,373 / 110,851 / 164,511 / 219,407 / 263,846 / 383,313 tCO2e), making it impossible to confirm a single verified credit quantity without further clarification
- VPA-015 actual generation is one-third of the estimated output (flagged as CAR 03 in the 2024 verification report), and the project overall reports lower-than-expected generation due to irradiation, grid outages, and equipment failures
- CORSIA eligibility and CCP status are both not stated in any available document, leaving double-claiming risk unassessed
- No buffer pool percentage, no permanence claim period, and no reversal-event data found in the extracted record
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 5,348 | 5,348 | 0 | |
| 2022 | 11,221 | 11,221 | 0 | |
| 2023 | 11,601 | 11,601 | 0 | |
| 2024 | 9,249 | 9,249 | 0 | |
| Total | 37,419 | 37,419 | 0 |
Risk Indicators
VVB-confirmed (2026) but contradicted by 2024 report
mixed evidence / unresolved risk
Deemed negligible, appropriate for grid-displacement solar
Jurisdictional per 2026 VR but contradicted by 2024 VR; grid EF from 2018
Grievance mechanism present, 0 grievances; FPIC status contradicted
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →