SMG - Access to Clean Cooking in Himalayas VPA 01
GS-4411 ↗ · current registry ID: GS12488
#125of 1329 in Industrial#11of 101 in Nepal#243of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard clean-cooking-stove project in Nepal with confirmed additionality, a quantified 5% leakage deduction, and a consistent 90% usage rate, but undermined by a project-specific baseline, an unverified ERR figure sourced from an unidentified document, and a CORSIA-eligible status that introduces dual-channel risk. The ERR contradiction between documents (313,190 vs 19,415) and the null verified-ERR field prevent a reliable over- or under-delivery assessment.
Red Flags
- The claimed ERR of 313,190 tCO2e originates from a document identified only as 'unknown' (dated 2022-08-16), while the monitoring report (dated 2020-10-14, i.e. before the 2023–2027 crediting period) reports 19,415 tCO2e — the two figures cannot be reconciled and the verified ERR field is empty.
- CORSIA eligibility is confirmed while CCP status is not stated, creating a potential dual-channel allocation risk that is not explicitly excluded in the available documents.
- The verification report (2026-01-29) does not address reversal risk, and no buffer-pool percentage is stated in any document, leaving permanence protection for the 5-year crediting period unquantified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 19,415 | 0 | 19,415 | |
| Total | 19,415 | 0 | 19,415 |
Risk Indicators
VVB-confirmed combined test
reversal risk not addressed in verification report
5% quantified deduction with justification
Project-specific baseline; reassessment date not recorded
FPIC, grievance mechanism, benefit sharing documented
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →