Sogamoso Hydroelectric Project
#1278of 1935 in Renewable energy#76of 124 in Colombia#57of 99 in CerCarbono (CC)#994of 1287 in ACM0002
Audit Analysis
The Sogamoso Hydroelectric Project is a small-scale renewable energy avoidance project with a verified investment additionality test and jurisdictional baseline, but its credibility is significantly undermined by eleven material findings (including missing financial additionality evidence and PDD–monitoring report inconsistencies), six cross-document contradictions, and a low extraction confidence rating. The project delivered only about 64% of its pro-rata ex-ante expectation for the first monitoring year, which is conservative, but the 0% leakage deduction rests on a contradictory justification within the same verification report.
Red Flags
- Eleven material findings in the verification report, including omission of financial additionality assessment and baseline scenario justification, and inconsistencies between PDD and monitoring report measurement methods
- Internal contradiction within the verification report: leakage justification stated as both 'quantified' and 'deemed negligible' in the same document
- Baseline method contradicted across documents: verification report (2025) says jurisdictional, validation report (2024) says project-specific
- Grid emission factor differs between the PDD (0.223) and the verification report (0.1843, 2023), with no documented reconciliation
- Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 443,032 | 375 | 442,657 | |
| 2024 | 279,249 | 0 | 279,249 | |
| Total | 722,281 | 375 | 721,906 |
Risk Indicators
VVB-verified but contradicted and missing financial evidence
Hydro avoidance project, no inherent reversal risk
0% deduction with contradictory justification
Jurisdictional per VVB but contradicted by validation report
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →