SOKE (AKIS) WIND POWER PLANT
GS-876 ↗ · current registry ID: GS5009
#319of 1935 in Renewable energy#70of 295 in Turkey#137of 1801 in Gold Standard (GS)#241of 1287 in ACM0002
Audit Analysis
The Soke (Akis) Wind Power Plant is a Gold Standard wind project in Turkey with a solid investment-based additionality test confirmed by the VVB (IRR of 9.97% below the 15% World Bank benchmark) and no reversal risk inherent to avoidance-type wind generation. However, the project carries notable documentation quality concerns, including over 60 corrective actions in the verification report and contradictions across documents on baseline classification, leakage justification, and historical ERR figures. The project over-delivered relative to its pro-rata ex-ante expectation for the 2024 monitoring period, which is a positive signal for claim safety.
Red Flags
- Over 60 corrective actions required in the 2025 verification report, indicating significant monitoring report quality issues (value inconsistencies, date errors, meter count contradictions, SDG table errors)
- Contradiction in baseline method: the 2025 verification report classifies the baseline as 'project' while the 2023 PDD classifies it as 'jurisdictional' — for a wind project the baseline is inherently the grid, making the 'project' label misleading
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unaddressed
- FPIC was not conducted, though a grievance mechanism is in place
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 174,694 | 464 | 174,230 | |
| 2022 | 200,728 | 3,697 | 197,031 | |
| Total | 375,422 | 4,161 | 371,261 |
Risk Indicators
VVB-confirmed investment test, IRR below benchmark
Avoidance project, no reversal risk
0% deduction, standard for wind displacement
Grid EF used but classification contradicted across docs
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →