Vai al contenuto principale
VCS Energy industries (renewable/non-renewable sources) India Registry: Registered Documentazione completa General Methodology v2.0

Solar Energy Project(s) by SB Energy Private Limited

VCS-1805 ↗

4.1 / 10
Integrity
4.6
Transparency
4.1
Claim Safety
3.8
Documentation
3.4

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the verification report.

missing The verification report lists multiple corrective action requests and an open finding, including issues with metering documentation and consistency of reported ERs.

Transparency

verified The monitoring period and VVB identity are stated in the verification report, and the project has a recent verification date.

missing The extracted record has low extraction confidence and only one evidence document is clearly identified, with several documentation gaps in monitoring details.

Claim Safety

missing The verification report shows a large gap between claimed ERs and verified ERs, which raises over-crediting concerns.

inferred Leakage is stated as a 0% deduction, but the justification is not addressed in the available documents.

Documentation

verified The record includes a substantial number of extracted facts and a recent verification report dated 2024-02-28.

missing Low extraction confidence and multiple open corrective actions indicate incomplete or difficult-to-read documentation.

Detailed Analysis

Integrity

The verification report confirms additionality through an investment test and says reversal events are not applicable for this solar project, which supports the integrity score. At the same time, the report lists several corrective action requests and an open finding, including missing metering documentation and a missing declaration on use of credits for other programs, which weakens confidence in the project controls. Leakage is shown as a 0% deduction, but the justification is not addressed in the available record, so that benefit is only partially supported.

Transparency

The verification report identifies VKU Certification Pvt. Ltd. as the VVB and gives a monitoring period from 2023-02-01 to 2023-08-31, which helps transparency. However, the extracted record has low extraction confidence, and the evidence base is thin because only one document is clearly identified in the record. Several monitoring details are missing or incomplete, including usage monitoring method and some supporting metering information.

Claim Safety

The gap between total emission reductions claimed and total emission reductions verified is material, which is a direct over-crediting concern. The project is a solar renewable project under ACM0002, but the leakage justification is not addressed even though a zero leakage deduction is reported. Because CORSIA eligibility and CCP status are not stated, dual-claim risk cannot be ruled out from the extracted record.

Documentation

The project has a recent verification report and a relatively large set of extracted facts, which is a positive sign for documentation coverage. But the extraction confidence is low, and the report itself contains multiple CARs, CLs, and a FAR, indicating incomplete or problematic documentation quality. The crediting period is long and the monitoring period is recent, but the open issues reduce confidence in the completeness of the file.

Overall

I privileged the 2024-02-28 verification report over older values because it is the most recent and specific source in the record. The contradictions matter: the report shows different emission reduction totals than earlier documents, and it also conflicts with an earlier statement that leakage was deemed negligible while the newer record says leakage is not addressed; I therefore weighted the newer verification report more heavily and reduced confidence. The report also indicates benefit-sharing and stakeholder-process documentation issues, plus a missing no-double-accounting declaration, so the overall score is held down despite the project’s renewable nature and confirmed additionality.

Audit Analysis

The project has some strengths: the VVB confirmed additionality through an investment test, and the project is a renewable solar activity with no reversal risk in the usual sense. However, the verification report shows multiple open or recently raised findings, missing leakage justification, and a material mismatch between claimed and verified emission reductions, which weakens confidence in the credited volume.

Project Description

Proponent: Adani Renewable Energy Devco Private Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 4354646 tCO2e Region: Asia Registration date: 2018-09-24

Red Flags

  • The verification report records several corrective action requests and an open finding, including missing metering details and a missing no-double-accounting declaration.
  • Claimed and verified emission reductions differ materially, and the report also notes inconsistencies in the monitoring report figures.
  • Leakage is not properly justified in the available record, and the extraction confidence is low.

Credit Vintages

Issued Retired Available
2017
521,071 519,791 1,280
2018
810,552 801,385 9,167
2019
626,090 626,090 0
2020
1,519,558 1,519,558 0
2021
1,730,865 1,680,865 50,000
2022
2,515,797 1,059,351 1,456,446
2023
1,576,896 5,329 1,571,567
Total 9,300,829 6,212,369 3,088,460

Cosa migliorerebbe questo punteggio

  • Provide a fully reconciled emissions calculation package showing why claimed and verified ERs differ and resolve all open CARs and CLs.
  • Document leakage rationale, no-double-counting safeguards, and any registry or program overlap status for each SPV with clear supporting evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; reversal not applicable

Leakage

Zero deduction but justification missing

Baseline

Project baseline with reassessment date known

Safeguards

FPIC and grievance mechanism present, but stakeholder proces

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti