Solar Home Systems In Lagos - Tranche 1
#55of 79 in Nigeria#969of 1339 in Verra (VCS)#23of 44 in AMS-I.F
Audit Analysis
This VCS solar home system project in Lagos has a confirmed additionality assessment and no permanence risk (avoidance project), but suffers from significant data contradictions between the PDD and validation report—particularly a 53% discrepancy in lifetime ERR and a conflicting grid emission factor. No monitoring or verification data is available, and the low extraction confidence further limits confidence in the extracted record. The project-specific baseline and 0% leakage deduction, while not uncommon for this project type, are compounded by contradictory justifications across documents.
Red Flags
- Lifetime ERR differs by 53% between the PDD (124,271 tCO₂e) and the validation report (57,947 tCO₂e), indicating a major revision that is not fully explained in the extracted record
- Grid emission factor contradicts between documents: 1.22 tCO₂/MWh in the PDD versus 0.567 tCO₂/MWh in the validation report, a 54% difference that materially affects credit volume
- Baseline method is stated as 'project-specific' in the validation report but 'jurisdictional' in the PDD, creating ambiguity about the robustness of the baseline
- No monitoring report or verification report is present in the evidence set; total verified ERR and monitoring period are not available
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, N/A
0% deduction, contradictory justification
Project-specific, contradicts PDD
Grievance mechanism present, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →