A 10-year solar PV project in India with VVB-confirmed additionality and a jurisdictional baseline, but the verification report contains 28 material findings including inconsistencies in emission reduction values across documents, an unexplained gap between ex-ante and monitored ERs, and a double-counting flag in the verification summary table. The project type (solar) inherently carries low permanence and leakage risk, yet the volume of data-quality issues and missing information (FNRB, usage rates, CORSIA/CCP status) limits confidence in the credit's robustness.

Red Flags

  • Verification report material finding states 'Double counting issuance and claiming is marked as yes' in the validation/verification summary table, though a corrective action suggests this may be a template misinterpretation by the VVB
  • Inconsistencies in operating margin and capacity factor values between the ER sheet and PDDMR section 8.1.1, with no explanation provided for the difference between estimated and monitored ERs
  • Section 10.5 reports 58,523 + 91,028 = 149,551 tCO2e for the monitoring period, while the verified total is 160,434 tCO2e — an unexplained gap of ~10,883 tCO2e
  • Section 7.2 of the verification report states 58,232 tCO2e for Nov–Dec 2024, while PDDMR section 10.6 states 58,523 tCO2e for the same period

Credit Vintages

IssuedRetiredAvailable
2024
103,1900103,190
2025
697,4940697,494
2026
694,7040694,704
2027
691,9250691,925
2028
689,1580689,158
2029
686,4010686,401
2030
683,6550683,655
2031
680,9210680,921
2032
678,1970678,197
2033
675,4840675,484
2034
573,2470573,247
Total6,854,37606,854,376

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Solar project, no reversal risk

Leakage

Deemed negligible, reasonable for solar

Baseline

Jurisdictional, reassessment not yet due

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA/CCP status not stated; DC flag in report

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents