A solar thermal electricity project in India with VVB-confirmed additionality and conservative verified emissions reductions (67% of pro-rata expectation), but undermined by significant contradictions in baseline method, lifetime ERR estimates, and leakage justification across documents. Multiple material findings and corrective actions indicate documentation quality issues, and the absence of a documented buffer pool or permanence mechanism is a notable gap for an avoidance-type project.
Red Flags
- Lifetime ex-ante ERR estimate differs by a factor of ~5 between the PDD (1,131,600 tCO2e) and the 2016 monitoring report (230,040 tCO2e), with no documented explanation for the revision
- Baseline method is described as 'project-specific' in the verification report but 'jurisdictional' in the monitoring report — a fundamental methodological contradiction
- Leakage deduction is 0% with justification described as 'quantified' in the verification report but 'deemed negligible' in the monitoring report — internally inconsistent
- Multiple material findings in the 2019 verification report: missing calibration certificates, missing ER cross-check sheet, missing feeder-wise location details, and use of an outdated MR template
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 500 | 500 | 0 | |
| 2015 | 500 | 500 | 0 | |
| 2016 | 500 | 500 | 0 | |
| 2018 | 15,306 | 15,306 | 0 | |
| Total | 16,806 | 16,806 | 0 |
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
0% deduction, inconsistent justification
Project-specific, method contradicts monitoring report
Grievance mechanism and benefit sharing present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →