#168of 975 in India#138of 1801 in Gold Standard (GS)#2of 115 in AMS-I.C
Audit Analysis
Gold Standard solar water heater project (CPA-5) with a VVB-confirmed combined additionality test and recent baseline reassessment, but weakened by an unaddressed 0% leakage deduction in the latest verification report, absence of a stated buffer pool, and numerous inter-document contradictions that undermine data reliability. The project appears to be over-delivering relative to its ex-ante estimate, which is conservative for buyers but raises questions about the original scoping.
Red Flags
- Leakage deduction of 0% with justification described as 'not addressed' in the 2025 verification report, a regression from the 2022 report which at least deemed it negligible
- Reversal events explicitly marked as 'not addressed' in the extracted record
- Verified ERR (169,552) exceeds claimed ERR (73,425) for the 2024 monitoring period, an unusual inversion that suggests data quality issues or scope confusion
- FPIC status contradicts between the 2020 verification report (not conducted) and the 2025 validation report (conducted), leaving the true status ambiguous
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 30,319 | 30,319 | 0 | |
| 2022 | 35,490 | 4,000 | 31,490 | |
| 2023 | 8,751 | 8,751 | 0 | |
| Total | 74,560 | 43,070 | 31,490 |
Risk Indicators
Combined test, VVB-confirmed
reversal not addressed
0% deduction, justification not addressed (2025)
Project-specific; reassessed 2025
Grievance mechanism present; FPIC status contradictory
CORSIA and CCP status both undetermined
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →