SolarAce1 Energy Project

GS-2164 ↗ · current registry ID: GS7575

#7of 19 in Philippines#389of 1801 in Gold Standard (GS)#559of 1287 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

SolarAce1 is a Gold Standard solar thermal electricity project in the Philippines with VVB-confirmed additionality and no reversal events, but it carries moderate integrity risk from a project-specific baseline, an unaddressed leakage justification, and the absence of FPIC. Monitoring data shows the project over-delivered in 2023 (144% of pro-rata expectation), which is reassuring for claim safety, yet several key parameters (FNRB, usage rates, CORSIA/CCP status) remain unstated. Documentation quality is weakened by low extraction confidence, one unidentified source document, and six outstanding corrective actions.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2023 verification report, contradicting the PDD's 'deemed negligible' claim — the more recent verification report takes precedence, leaving the 0% deduction without a documented basis.
  • Baseline method is project-specific per the 2023 verification report (overriding the PDD's 'jurisdictional' label), which is less robust and more susceptible to manipulation than a standardised or jurisdictional baseline.
  • FPIC was not conducted, and the verification report lists six corrective actions including a missing board resolution confirming 100% equity funding and an unimplemented CSR plan, indicating governance gaps.
  • Minimum extraction confidence is rated low, and one of the nine source documents is listed as 'unknown', reducing confidence in the completeness of the evidence base.

Credit Vintages

IssuedRetiredAvailable
2021
53,360053,360
2022
111,3610111,361
Total164,7210164,721

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Solar electricity – no reversal risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, reassessment not stated

Safeguards

Grievance & benefit sharing present, FPIC absent

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents