Soma Wind Power Plant
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project case.
missing Leakage is not addressed in the latest verification record, and reversal events are not addressed; this weakens permanence and baseline confidence.
Transparency
verified The monitoring period is stated, the VVB is named, and the monitoring approach uses smart meters, which helps traceability.
missing The extracted record has a low extraction-confidence flag and only one evidence document is listed, limiting transparency.
Claim Safety
verified The project uses a project baseline under ACM0002 and the baseline was reassessed in 2024, which is better than an unstated baseline.
missing The claimed versus verified emission reduction figures differ materially, and CORSIA eligibility is not stated, leaving residual over-crediting and dual-claim risk.
Documentation
verified The record includes a named VVB, a monitoring period, a crediting period, and multiple corrective actions that were closed out.
missing The extraction confidence is low, several key fields are missing, and the contradiction list shows unresolved differences across documents.
Detailed Analysis
Integrity
The project has a positive additionality signal because the verification report says the VVB confirmed additionality through an investment test. Baseline validity is moderate: the project uses a project baseline under ACM0002 and the baseline was reassessed in 2024, but leakage is marked as not addressed in the latest verification record and reversal events are also not addressed. The absence of a buffer pool figure and the weak permanence treatment keep the score below strong-project territory.
Transparency
Transparency is mixed. The verification report identifies Bureau Veritas (India) Pvt. Ltd., gives a monitoring period from 2023-07-01 to 2024-08-12, and states smart-meter monitoring, which is helpful. However, the extracted record has low extraction confidence, only one evidence document is listed, and several key fields such as CORSIA eligibility and FNRB treatment are not found in the available documents.
Claim Safety
Claim safety is weakened by the discrepancy between claimed and verified emission reductions, with 183,704 claimed versus 239,594 verified in the extracted record. The project’s baseline is at least specified and recently reassessed, but leakage treatment is inconsistent across documents and CORSIA eligibility is not stated. Because the record does not clearly resolve dual-claim exposure or over-crediting concerns, the score remains cautious.
Documentation
Documentation quality is limited by the low extraction-confidence flag and the fact that only one evidence document is listed in the extracted record. On the positive side, the report includes a named verifier, monitoring and crediting periods, and a list of corrective actions that were closed out. Still, the contradiction list shows multiple unresolved differences across documents, which lowers confidence in the completeness of the file.
Overall
I privileged the latest verification report for leakage, reversal status, and verified issuance because it is the most recent document in the record, while noting that earlier documents reported different values. Specifically, the record contains contradictions on additionality test type, leakage treatment, reversal status, verified emission reductions, and crediting period; these were all treated as reliability concerns and pushed scores downward. The project is not a clear failure, but the combination of contradictory figures, low extraction confidence, and incomplete treatment of leakage and reversals prevents a high-confidence assessment.
Audit Analysis
This wind project has some positive signals, including VVB-confirmed additionality, a recent baseline reassessment, and no reported leakage deduction. However, the record also shows major documentation weaknesses, a low extraction-confidence flag, and several unresolved contradictions across documents, which reduce trust in the claimed issuance and project history.
Project Description
Developer: Bilgin Güc Santralleri Enerji Üretim A.S Type: Wind Size: Large Scale Crediting period: 2010-08-13 → 2031-08-12 Estimated annual credits: 163556 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action
Red Flags
- The verification report shows a large discrepancy between claimed and verified emission reductions, with 183,704 claimed versus 239,594 verified, which needs explanation.
- Leakage and reversal treatment are weakly documented: leakage is marked as not addressed in the latest record, and reversal status is also not addressed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 47,106 | 47,106 | 0 | |
| 2011 | 195,837 | 195,837 | 0 | |
| 2012 | 177,041 | 162,755 | 14,286 | |
| 2022 | 105,427 | 0 | 105,427 | |
| 2023 | 78,277 | 0 | 78,277 | |
| Total | 603,688 | 405,698 | 197,990 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled issuance table that explains the claimed-versus-verified emission reduction discrepancy and resolves the crediting-period contradiction.
- Publish explicit leakage, reversal, and buffer-pool treatment in the latest verification package, along with clear CORSIA and CCP status.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No buffer pool stated; reversals not addressed
0% deduction but justification not addressed
Project baseline with recent reassessment
FPIC, grievance mechanism, and benefit sharing documented
CORSIA eligibility not stated; CCP status not mentioned
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Final_Ver Report_1125 Soma Wind_Khalid Mahmood_v04_25-07-2024_cc.pdf
- Final_ER Calculations_Soma WPP_v04_6102022.xlsx
- Final_ER calculations_1125 Soma Wind_v01_08-09-2025.xlsx
- GS 655 Soma WPP_Annual Report 2023.pdf
- SDG-Impact-tool_SomaWPP_V02_23-07-2024.xlsx
- Final_ER calculations_1125 Soma Wind_v01_15-09-2025.xlsx
- +8 more
Other
pdd
validation
- Verification Report_v03_GS 655 Soma Wind (5th MP)_Signed.pdf
- Verification Report_v05_GS 655 Soma Wind (4th MP)_Öykü Yakupoğlu_26-02-2026_clean.pdf
- (1)Verification Report_2nd monitoring period_01-07-12 to 31-12-12_v2.0.pdf
- GS.VAL.23.74_FVR_V2.0_Clean.pdf
- Soma Validation Report dd 08 12 2011.pdf
- (1)Verification Report_1st monitoring period_13-08-10 to 30-06-12_v1.0.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →