Song Ong Hydropower Project
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB using an investment test (monitoring report, 2023-02-28).
missing Corrective actions flag baseline equation issues and boundary omissions (auxiliary consumption; possible grid import), which can materially affect ERs (monitoring report, 2023-02-28).
Transparency
verified VVB is identified (TUV SUD) and a specific monitoring period is stated (2018-03-01 to 2019-03-23) (monitoring report, 2023-02-28).
missing Claimed ERs are not found in the extracted record and ER figures conflict across documents, reducing traceability (validation reports, 2020-11-07 vs 2023-09-13).
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (extracted record).
missing Over-crediting risk is elevated by contradictory ER totals and unresolved MRV/boundary corrective actions (monitoring report, 2023-02-28; validation reports, 2020-11-07 vs 2023-09-13).
Documentation
verified A relatively broad document set is referenced (PDD, monitoring report, validation report, issuance) with 16 documents used and high extraction confidence (extracted record).
missing Numerous corrective actions request missing/unclear evidence (undertaking on double counting, grievance register, invoices/plant records, calibration certificates), indicating documentation gaps (monitoring report, 2023-02-28).
Detailed Analysis
Integrity
Additionality appears reasonably supported because the monitoring report (2023-02-28) states the VVB confirmed additionality using an investment test. However, integrity is weakened by multiple corrective actions indicating methodological/boundary problems, including an incorrect baseline equation and an incomplete project boundary (auxiliary internal consumption) and the need to address likely grid import during outages (monitoring report, 2023-02-28). Leakage is not robustly evidenced: the latest monitoring report treats leakage as negligible, but no leakage deduction percentage is found in the extracted record.
Transparency
Core MRV identifiers are present (VVB name TUV SUD; monitoring period 2018-03-01 to 2019-03-23) in the monitoring report (2023-02-28). Transparency is reduced because total claimed ERs are not found in the extracted record, and the verified ER figure is inconsistent across validation reports (2020-11-07 vs 2023-09-13). The monitoring report (2023-02-28) also notes the VVB could not confirm some evidence because documents were in local language, limiting auditability for external reviewers.
Claim Safety
The project is explicitly not CORSIA-eligible, which lowers the risk of high-impact aviation claims (extracted record). Nonetheless, claim safety is constrained by over-crediting signals: ER totals differ substantially between validation reports (127,120 vs 19,366), and corrective actions highlight boundary and baseline-calculation issues that can change credited volumes (monitoring report, 2023-02-28). Leakage treatment is inconsistent across monitoring reports and not quantified in the extracted record, adding uncertainty to net climate benefit claims.
Documentation
Documentation coverage is moderate-to-good in breadth (PDD, monitoring report, validation report, issuance) with 16 documents used and high extraction confidence (extracted record). However, the monitoring report (2023-02-28) lists many corrective actions requesting missing or unreviewable supporting evidence (grievance register with translation, invoices/plant records for electricity supplied, calibration certificates), indicating that key substantiation was not readily verifiable. The presence of numerous CARs related to the PDD (typos, boundary tables, policy consideration, baseline equation) also suggests quality-control weaknesses in the document set.
Overall
Overall quality is mid-range: additionality is VVB-confirmed and the project is not CORSIA-eligible, but MRV and consistency issues materially increase uncertainty. Contradictions were handled conservatively: for leakage, the more recent monitoring report (2023-02-28) stating leakage is negligible was privileged over the older monitoring report (2020-10-31) saying it was not addressed, but the score is still penalized because no leakage deduction percentage is evidenced. For safeguards and grievance mechanism, the newer monitoring report (2023-02-28) was privileged over the 2012 monitoring report, yet scores were reduced because the historical contradiction suggests evolving or inconsistently recorded practices. For benefit sharing and FPIC, the validation report (2023-09-13) was treated as more authoritative than older monitoring/PDD-era statements, but the contradiction itself lowers confidence. For ER totals (19,366 vs 127,120), the more recent validation report (2023-09-13) was privileged, and the large discrepancy drove a significant downward adjustment to transparency and claim-safety.
Audit Analysis
The project has VVB-confirmed additionality and uses a recognized small-scale grid-connected renewable methodology, but several corrective actions and internal inconsistencies across documents raise reliability and over-crediting concerns. Leakage and safeguards treatment is inconsistently documented, and key quantitative fields (e.g., claimed ERR, leakage deduction) are missing from the extracted record.
Project Description
The Song Ong Hydropower Project is a renewable energy initiative that generates 8.1 MW of power and provides 40,500 MWh of clean electricity annually to the national grid in Vietnam. The project includes the construction of a dam, intake, tunnels, penstock, pressurized well, powerhouse, and discharge channel to convert flowing energy into electricity. Through a Power Purchase Agreement with the Electricity Corporation of Vietnam, the project supplies net electricity via a 22 kV transmission line to the Ninh Son 110/22 kV transformer station.
Red Flags
- Large discrepancy in verified emission reductions across validation reports (19,366 vs 127,120), indicating potential data reliability or boundary/method changes.
- Multiple corrective actions note inability to confirm key monitoring evidence due to documents in local language and missing calibration certificates, increasing MRV risk.
- Leakage treatment is inconsistent across monitoring reports (deemed negligible vs not addressed), with no quantified leakage deduction found in the extracted record.
- Safeguards/FPIC and grievance mechanism are contradictory across documents, increasing social safeguard and reputational risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 14,129 | 14,129 | 0 | |
| 2010 | 24,011 | 19,308 | 4,703 | |
| 2011 | 3,115 | 3,115 | 0 | |
| 2012 | 18,367 | 18,367 | 0 | |
| 2013 | 21,810 | 21,810 | 0 | |
| 2014 | 18,392 | 18,392 | 0 | |
| 2015 | 17,450 | 17,450 | 0 | |
| 2016 | 20,190 | 20,190 | 0 | |
| 2017 | 27,698 | 18,675 | 9,023 | |
| 2018 | 3,213 | 3,213 | 0 | |
| Total | 168,375 | 154,649 | 13,726 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation of ER calculations and totals across the 2020 and 2023 validation/verification materials, including any boundary/method changes and corrected baseline equations.
- Provide complete, translated monitoring evidence (electricity export records for the full monitoring period, meter calibration certificates, and a maintained grievance register) and explicitly state/quantify leakage treatment (even if 0%) with justification.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversals evidenced
Negligible claimed but inconsistently addressed
Project-specific baseline; reassessment timing unclear
Safeguards/grievance/FPIC inconsistently documented
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →