Suba and Usaquen Hydroelectric Umbrella Project
#574of 1935 in Renewable energy#17of 124 in Colombia#320of 1339 in Verra (VCS)#194of 806 in AMS-I.D
Audit Analysis
A Colombian hydroelectric project under VCS AMS-I.D with a jurisdictional baseline and VVB-confirmed additionality, but hampered by 12 material findings (data inconsistencies, missing analyses, calibration gaps), unresolved contradictions on FPIC and grievance mechanism, and a verified ERR that delivered only ~62% of the pro-rata ex-ante expectation for the elapsed monitoring period. The core design elements are sound for a renewable energy project, but documentation quality and stakeholder-engagement evidence are weak.
Red Flags
- 12 material findings in the verification report, including inconsistent installed-capacity values, inconsistent EGfacility figures across reports, missing ex-ante vs. achieved ERR analysis, and unverified calibration-error checks against MPE
- FPIC status contradicts between two PDD versions (conducted per Dec-2023 PDD, not conducted per Apr-2024 PDD); the more recent document indicates FPIC was not carried out
- Grievance mechanism presence contradicts between the verification report (present) and the 2024 PDD (absent)
- Verified ERR of 15,525 tCO₂e for the 2019–2021 monitoring period represents only ~62% of the pro-rata expectation derived from the 82,844 tCO₂e lifetime ex-ante estimate, suggesting the ex-ante baseline may be optimistic
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 6,809 | 6,809 | 0 | |
| 2019 | 4,143 | 1,800 | 2,343 | |
| 2020 | 3,417 | 0 | 3,417 | |
| 2021 | 7,965 | 750 | 7,215 | |
| Total | 22,334 | 9,359 | 12,975 |
Risk Indicators
Combined test, VVB-confirmed
Non-AFOLU, no reversal risk
0% deemed negligible, reasonable for hydro
Jurisdictional but contradicted by validation report; reasse
FPIC and grievance mechanism status contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →