Tailai Tangchi Solar PV Power Generation Project

GS-1329 ↗ · current registry ID: GS2535

#576of 1935 in Renewable energy#274of 1084 in China#290of 1801 in Gold Standard (GS)#195of 806 in AMS-I.D

5.7/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A Gold Standard grid-connected solar PV project in China with VVB-confirmed additionality and a reasonable 0% leakage deduction for its project type. However, significant contradictions across documents—particularly on baseline method, leakage justification, and FPIC status—undermine confidence in the data record, and the absence of a verified ERR figure prevents a meaningful claim-safety assessment.

Red Flags

  • Baseline method is contradictory: the 2023 verification report labels it 'project' while the 2022 validation report calls it 'jurisdictional'; for a grid-connected solar PV project the baseline should be the jurisdictional grid emission factor, making the 'project' label in the more recent document inconsistent with the methodology (AMS I.D.).
  • Leakage justification is inconsistent: the 2023 verification report states leakage was 'not addressed' while the 2022 verification report says it was 'deemed negligible'; the 0% deduction is reasonable for grid-connected solar but the lack of a consistent, explicit justification in the most recent document is a gap.
  • FPIC status is directly contradictory: the monitoring report (Oct 2020) records FPIC as conducted, while the PDD (same date) records it as not conducted; this cannot be resolved without further documentation.
  • No verified ERR figure was found in the extracted record, preventing any comparison of claimed versus delivered credits for the 2024 monitoring period.

Credit Vintages

IssuedRetiredAvailable
2015
13,6252,00911,616
2016
14,80325014,553
2017
900618282
2019
5,8175,701116
2020
14,0363,44910,587
2021
13,506013,506
2022
6060606
Total63,29312,02751,266

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals reported

Leakage

0% deduction, justification inconsistent across docs

Baseline

Method contradictory (project vs jurisdictional)

Safeguards

FPIC contradictory, grievance mechanism present

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06AMS I.D. “Grid connected renewable electricity generation”

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents