Taiqian County MSW Landfill Site LFG Comprehensive Utilization Project

VCS-3006 ↗

#532of 1084 in China#626of 1339 in Verra (VCS)#13of 34 in AMS-III.G

5.2/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A VCS landfill gas capture and utilization project in China verified by Applus+ Certification, with a well-established AMS methodology and a conservative delivery rate (66% of pro-rata expectation). However, five cross-document contradictions—including a critical discrepancy on whether LFG capture is legally required—undermine confidence in the additionality claim and data reliability. Material findings on baseline justification and monitoring parameters further moderate the assessment.

Red Flags

  • Contradiction on whether LFG capture is legally required: the verification report (Oct 2023) states it is, while the validation report (Nov 2022) states it is not—directly threatening the additionality claim
  • Grid emission factor differs by 50% between the monitoring report (0.57025) and the verification report (0.8587), raising questions about which value was actually used in the ERR calculation
  • Four material findings at verification, including a required baseline justification due to GB 50869-2013 and incorrect monitoring parameters per the methodology
  • Permanence/reversal risk dismissed as 'not applicable as a renewable project' without a buffer pool or quantified reversal analysis, which is atypical for a finite-resource LFG project

Credit Vintages

IssuedRetiredAvailable
2021
7,14907,149
2022
25,287025,287
2023
24,432024,432
Total56,868056,868

Risk Indicators

Additionality

VVB-confirmed combined test, but legal-requirement contradiction unresolved

Permanence

Reversal dismissed as N/A

Leakage

0% deduction with quantified justification in verification report

Baseline

Project-specific modeled baseline; reassessment not yet due under VCS 10-year rule

Safeguards

Safeguards and grievance mechanism mentioned; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS-III.G, AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents