Taspinar Wind Solar Hybrid Project
GS-1528 ↗ · current registry ID: GS6793
#200of 295 in Turkey#742of 1801 in Gold Standard (GS)#826of 1287 in ACM0002
Audit Analysis
The Taspinar Wind Power Project is a Gold Standard wind credit with VVB-confirmed additionality and a recently reassessed (2024) project-specific baseline, but it carries a heavy burden of open corrective actions (21 CARs, 12 FARs, 2 CRs) and several unresolved data gaps including no stated buffer pool, unaddressed reversal risk, and a missing verified ERR figure. The project delivered roughly 128% of its pro-rata ex-ante expectation for the 2024 monitoring period, which is encouraging, but the volume of outstanding findings and contradictions across documents temper confidence in the credit's robustness.
Red Flags
- 21 corrective actions (CAR1–CAR21) and 12 follow-up actions (FAR1–FAR12) remain listed in the 2024 verification report, indicating persistent documentation and compliance gaps
- Reversal risk is explicitly 'not addressed' and no buffer pool percentage is stated in any available document
- FPIC was not conducted, despite the project involving land expropriation of residential parcels (noted in FAR8)
- Total verified ERR is not found in the extracted record; only the claimed figure of 141,020 tCO₂e for 2024 is available
- Baseline method is contradictory: the 2024 verification report states 'project' while the validation report (one day earlier) states 'jurisdictional'
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 84,427 | 51,251 | 33,176 | |
| 2022 | 106,676 | 0 | 106,676 | |
| 2023 | 97,956 | 0 | 97,956 | |
| Total | 289,059 | 51,251 | 237,808 |
Risk Indicators
VVB-confirmed but test type disputed across documents
reversal risk not addressed
0% deduction, deemed negligible (reasonable for wind)
Project-specific; method contradicts validation report
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →