TATLIPINAR WIND POWER PLANT
GS-1787 ↗ · current registry ID: GS7105
#575of 1935 in Renewable energy#119of 295 in Turkey#289of 1801 in Gold Standard (GS)#444of 1287 in ACM0002
Audit Analysis
The Tatlipinar Wind Power Plant is a straightforward renewable-energy avoidance project with a sound additionality assessment (combined test, VVB-confirmed) and an appropriate jurisdictional grid-emission-factor baseline. However, the project carries 14 outstanding corrective actions covering calculation errors, missing environmental reports, and data inconsistencies, and six cross-document contradictions undermine confidence in the reported figures. The absence of a verified ERR figure for the 2024 monitoring period prevents any over- or under-delivery check.
Red Flags
- 14 corrective actions remain open, including incorrect EGy and EFCO2 calculations, missing ornithology and noise reports, and an unsubmitted 2022 annual report
- Six contradictions across documents (baseline method, leakage justification, ERR figures, grid EF, crediting period) indicate inconsistent record-keeping
- No verified ERR figure is available for the 2024 monitoring period, so actual delivery cannot be confirmed against the ex-ante estimate
- Document date inconsistencies: a monitoring report dated 2020-10-14 is cited for a 2024 monitoring period, raising questions about version control
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 163,230 | 0 | 163,230 | |
| 2022 | 235,906 | 0 | 235,906 | |
| 2023 | 52,031 | 0 | 52,031 | |
| Total | 451,167 | 0 | 451,167 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, quantified justification
Jurisdictional grid EF, but method contradicted across docs
Grievance & benefit sharing present, FPIC not conducted
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →