Teesta Low Dam Project, Stage-IV
#784of 975 in India#1019of 1339 in Verra (VCS)#1106of 1287 in ACM0002
Audit Analysis
The Teesta Low Dam Stage-IV is a registered VCS hydro project with a fundamentally sound design (grid displacement, no reversal risk), but its verification record is marred by an extensive list of material findings, 19 corrective actions, a 2014 grid emission factor, and a VVB that failed to perform several required assessments. Data quality issues—including missing generation data, calibration gaps, and multiple deviations in data sourcing—undermine confidence in the reported emission reductions.
Red Flags
- The 2024 verification report lists 24 material findings, including the VVB's failure to assess the project proponent, project start date, legal compliance, and ownership as required by the VCS Validation Report Template
- The common practice additionality analysis relied on a Kyoto Protocol ratification date as a time constraint, which the VVB was required to re-conduct (CAR)
- The grid emission factor of 0.9678 tCO2/MWh is from 2014 and has not been updated in the available documents
- Missing generation data for October/November 2019, April 2020, and March 2021, plus a complete plant shutdown in 2017 (July–September) due to agitations
- Multiple deviations were requested to substitute 'Deviation Settlement Account' records for the methodology-required electricity meter data, and calibration reports for import meters were unavailable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 970,204 | 139,724 | 830,480 | |
| 2017 | 176,233 | 176,233 | 0 | |
| Total | 1,146,437 | 315,957 | 830,480 |
Risk Indicators
VVB-confirmed but CAR to re-conduct common practice analysis
Energy project – no reversal risk
0% deduction, deemed negligible for hydro displacement
Project-specific, 2014 grid EF, no reassessment date found
Grievance mechanism and benefit sharing present; FPIC not st
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →