Thai Hoa Wind Power Project

GS-3272 ↗

5.8 / 10
Integrity
6.2
Transparency
5.4
Claim Safety
5.6
Documentation
6.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under ACM0002 Version 20.0.

missing Leakage justification is not addressed in the verification report, and the buffer pool percentage is not found in the extracted record.

Transparency

verified A named VVB is identified, and the monitoring period for the latest verification cycle is stated as 2024-01-01 to 2024-12-31.

missing Total claimed versus verified emission reductions are not stated, and the monitoring method for usage is not found in available documents.

Claim Safety

verified The project is a wind power activity under Gold Standard, with no extreme event reported as causing a reversal in the verification report.

missing Leakage treatment is weakly documented because the verification report does not explain the 0% deduction, and CORSIA eligibility is marked true while CCP status is not stated.

Documentation

verified Multiple evidence documents were used, including the PDD, verification report, monitoring report, and stakeholder consultation material.

missing The extraction confidence is only medium, and several corrective action requests were raised, even though they were later closed satisfactorily.

Detailed Analysis

Integrity

The project scores moderately well on integrity because the verification report confirms additionality and identifies a combined additionality test under ACM0002 Version 20.0. The project also reports no extreme event causing reversal in the verification report, but the record does not state a buffer pool percentage and does not clearly explain leakage in the verification report. The absence of a clear leakage rationale and the missing buffer information keep the score below strong-project territory.

Transparency

Transparency is mixed: the VVB is named as 4K Earth Science Private Limited and the latest monitoring period is clearly stated. However, total claimed and verified emission reductions are not found in the extracted record, and the usage monitoring method is also not stated. The missing MRV quantities and methods limit public auditability.

Claim Safety

Claim safety is weakened by incomplete leakage documentation and by the fact that CORSIA eligibility is true while CCP status is not stated. The project is a wind project, which generally lowers reversal risk, but the record still contains a contradiction on reversal-events detail between the verification report and a later source. Because the verification report is the more direct assurance document, I privileged its statement that no extreme event was reported, but the inconsistency still reduces confidence.

Documentation

Documentation is reasonably broad, with evidence from the PDD, verification report, monitoring report, and stakeholder consultation materials, and the project also shows a grievance mechanism and FPIC being conducted. Still, the extraction confidence is only medium, and the verification report lists five corrective action requests and one clarification request, even though they were later closed satisfactorily. The crediting-period inconsistency between documents also suggests the documentation set is not fully clean.

Overall

I privileged the verification report for reversal-events and leakage treatment because it is the most recent assurance document in the extracted set, while the older monitoring report appears to contain a different leakage characterization and an earlier crediting-period window. I also privileged the PDD for the combined additionality test because the contradiction shows a later unknown source referring only to an investment test, which is less complete than the PDD’s stated combined test. These contradictions do not invalidate the project, but they do indicate reliability issues that justify a moderate overall score rather than a high one.

Audit Analysis

This is a wind project with a verified additionality assessment and no reported reversal event, but several key items are either not stated or internally inconsistent across documents. The main weaknesses are the lack of clear leakage justification in the verification report, missing public-facing MRV details, and a crediting-period inconsistency that reduces confidence in the record.

Project Description

Developer: South Pole Ltd SCV Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2021-10-31 → 2026-10-30 Estimated annual credits: 214728 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action

Red Flags

  • The verification report says leakage was not addressed, while an older monitoring report described leakage as negligible.
  • The crediting period differs between documents, and the reversal-events field is also inconsistent across sources.

Credit Vintages

Issued Retired Available
2021
28,760 0 28,760
2022
157,975 89,978 67,997
2023
91,324 88,033 3,291
Total 278,059 178,011 100,048

Cosa migliorerebbe questo punteggio

  • Publish a clear leakage rationale and the basis for the 0% deduction in the latest verification package.
  • Provide a complete MRV summary with claimed and verified issuance figures, usage monitoring details, and a reconciled crediting-period timeline.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No reversal event reported

Leakage

0% deduction, weak justification

Baseline

Project baseline, reassessment timing limited

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible, CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti