Tiligulska Wind Farm
#1192of 1935 in Renewable energy#6of 8 in UA#40of 154 in Intl. Carbon Registry (ICR)#928of 1287 in ACM0002
Audit Analysis
The Tiligulska Wind Farm is a jurisdictional-baseline wind avoidance project in Ukraine with VVB-confirmed additionality, but it carries a heavy burden of 20 material findings and 13 corrective actions, an incomplete safeguards tool, and a verified emission reduction that is only about 12% of the pro-rata expectation for the elapsed monitoring period. The project's location in an active conflict zone (missile attacks referenced in the verification report) adds operational and permanence uncertainty that is not fully addressed in the available documentation.
Red Flags
- Verified ER of 256,680 tCO₂e is only ~12% of the pro-rata expectation (~2,146,424 tCO₂e) for the 2-year monitoring period, raising questions about the validity of the ex-ante estimate or sustained generation in a conflict zone
- 20 material findings in the verification report include a direct contradiction on public comments (section 3.3.1 states none received, but the table lists comments), missing PPA documentation, and no actions taken on stakeholder comments
- The ICR Tool for Environmental and Socioeconomic Safeguards is explicitly listed as incomplete among the 13 corrective actions, and FPIC was not conducted
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 676,253 | 0 | 676,253 | |
| 2023 | 1,106,873 | 0 | 1,106,873 | |
| 2024 | 1,106,873 | 0 | 1,106,873 | |
| 2025 | 1,106,873 | 0 | 1,106,873 | |
| 2026 | 1,106,873 | 0 | 1,106,873 | |
| 2027 | 1,106,873 | 0 | 1,106,873 | |
| 2028 | 1,106,873 | 0 | 1,106,873 | |
| 2029 | 1,106,873 | 0 | 1,106,873 | |
| 2030 | 1,106,873 | 0 | 1,106,873 | |
| 2031 | 1,106,873 | 0 | 1,106,873 | |
| 2032 | 94,008 | 0 | 94,008 | |
| Total | 10,732,118 | 0 | 10,732,118 |
Risk Indicators
Combined test, VVB-confirmed
conflict-zone risk
0% deemed negligible, reasonable for wind
Jurisdictional, 2022 grid EF 0.643
ICR tool incomplete; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →