VCSAgriculture Forestry and Other Land UseKenya Registry: RegisteredGeneral Methodologyv2.1

TIST Program in Kenya, VCS 006

VCS-899 ↗

#97of 261 in Soil carbon#64of 157 in Kenya#746of 1339 in Verra (VCS)

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The TIST Kenya program is a large-scale smallholder agroforestry project with verified additionality, a 10% buffer pool, and CCB certification, but it carries a substantial burden of material findings including quantifier data errors requiring removal of 662 groves, 67 contract-violating harvest events, and open findings in a 2024 project review. The project delivered only about 46% of its pro-rata ex-ante expectation for the 2014–2021 monitoring period, which is conservative but raises questions about the accuracy of the original lifetime estimate. Overall, the project is functional and registered but its operational and data-integrity issues warrant caution.

Red Flags

  • Quantifier Shadrack Thuranira submitted erroneous data, requiring removal of 662 groves and 77,572 trees from project scope (verification report, 2021)
  • 67 Project Areas had harvest activity in violation of contract during the monitoring period (verification report, 2021)
  • Open findings remain in the Project Review Report dated July 24, 2024, indicating unresolved issues at the time of the latest available documentation
  • TIST Quantifiers were not visiting each Project Area once per year as described in the Project Design Document, though this was an operational goal rather than a methodology requirement
  • Insufficient farmer interviews (6 out of 27,000) to represent the community, with a well-being sample of 124 questioned for statistical validity

Credit Vintages

IssuedRetiredAvailable
2004
169,784169,7840
2012
138,802138,8020
2014
677,799659,37518,424
Total986,385967,96118,424

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

10% buffer, no reversals, but 2014 appendix noted events

Leakage

0% deduction, 'deemed negligible' justification only

Baseline

Project-specific, no stated reassessment date

Safeguards

FPIC, grievance mechanism, CCB certified

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents