Torlar 14.834 MWe Hydroelectric power plant
#400of 1935 in Renewable energy#88of 295 in Turkey#202of 1339 in Verra (VCS)#304of 1287 in ACM0002
Audit Analysis
The Torlar hydroelectric project demonstrates solid additionality (combined test confirmed by the VVB) and inherently low permanence risk as a non-AFOLU energy project. However, multiple contradictions between the verification report, monitoring report, and validation report—particularly on FPIC status, baseline method, and leakage treatment—combined with a low extraction confidence rating, introduce meaningful uncertainty into the project's data reliability.
Red Flags
- FPIC status contradicts between the 2024 verification report (conducted) and the 2013 validation report (not conducted), creating uncertainty about free, prior, and informed consent
- Baseline method is described as 'project-specific' in the verification report but 'jurisdictional' in the monitoring report, undermining confidence in the baseline's consistency
- Leakage justification is 'deemed negligible' in the verification report but 'quantified' in the monitoring report, with no clear reconciliation
- Low extraction confidence across the document set means key fields (buffer pool, FNRB, CORSIA eligibility, CCP status) could not be reliably extracted
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 16,773 | 0 | 16,773 | |
| 2014 | 4,270 | 0 | 4,270 | |
| 2015 | 23,065 | 0 | 23,065 | |
| 2016 | 12,894 | 0 | 12,894 | |
| 2017 | 15,388 | 0 | 15,388 | |
| 2018 | 17,181 | 0 | 17,181 | |
| 2019 | 25,090 | 0 | 25,090 | |
| 2020 | 8,732 | 0 | 8,732 | |
| Total | 123,393 | 0 | 123,393 |
Risk Indicators
Combined test, VVB-confirmed
Hydro plant, no reversal risk
0% deemed negligible, appropriate for grid-fed hydro
Project-specific, grid EF from 2010, method contradicts acro
Grievance mechanism present, FPIC status contradictory
CORSIA and CCP status not stated in extracted record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →