Ulan Phase II 10MWp Solar PV Project

GS-1331 ↗

5.9 / 10
Integrity
6.8
Transparency
5.6
Claim Safety
5.4
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which is a meaningful positive for project integrity.

missing Leakage is only described as negligible with a 0% deduction, and the project record does not show a quantified leakage analysis beyond that.

Transparency

verified The monitoring period, VVB name, methodology version, and baseline reassessment year are stated, which supports traceability.

missing Total emission reductions claimed and verified are not found in the extracted record, limiting public MRV transparency.

Claim Safety

verified The project uses a project baseline and a grid emission factor from the documents, which is consistent with a standard renewable electricity methodology.

missing CORSIA eligibility is marked true while CCP status is not mentioned, and the missing issuance totals increase over-claiming and double-claim uncertainty.

Documentation

verified Eighteen documents were used, the extraction confidence is medium, and the VVB identified and resolved three findings.

missing At least one key document was not clearly readable, and the record contains contradictions on benefit sharing, leakage treatment, reversal wording, and the crediting period.

Detailed Analysis

Integrity

The verification report confirms additionality through an investment test and says the VVB validated it, which supports the project’s core integrity case. The monitoring record also reports no accidental or emergency events affecting reductions, and no reversal events are reported. Leakage is treated as negligible with a 0% deduction, but the evidence for that treatment is thin rather than robust.

Transparency

The record identifies the Gold Standard registry, the VVB, the monitoring period from 2023-01-01 to 2023-12-31, and the methodology version, which helps with traceability. However, total emission reductions claimed and verified are not found in the extracted record, so the public-facing MRV picture is incomplete. The baseline was last reassessed in 2020, but the underlying documentation trail is not fully visible here.

Claim Safety

Claim safety is moderate because the project is a grid-connected solar project with a project baseline and a stated grid emission factor, which is broadly consistent with the methodology. Still, the absence of verified issuance totals, the lack of usage-rate evidence, and CCP status being not mentioned leave room for over-crediting or claim ambiguity. CORSIA eligibility being true raises the need for careful registry and claim separation.

Documentation

Documentation is decent but not strong: eighteen documents were used, the extraction confidence is medium, and the VVB resolved one clarification and two corrective actions. On the other hand, some key fields are not stated in the available documents, and the record contains multiple contradictions. The later 2022-08-12 records were privileged for benefit sharing, leakage, and crediting period because they are more recent than the conflicting 2022-05-09 or 2022-08-02 entries, but the inconsistencies still reduce confidence.

Overall

Overall, this looks like a reasonably well-documented renewable project with solid additionality evidence and no obvious permanence issue. I privileged the more recent 2022-08-12 document values over older conflicting entries for benefit sharing, leakage, and the crediting period, because recency is the best available tie-breaker, but the contradictions still lower reliability. The main weaknesses are incomplete issuance data, missing usage/claim detail, and moderate documentation quality, which keep the score below the top tier.

Audit Analysis

This is a generally credible Gold Standard solar project with VVB-confirmed investment-test additionality, no reported reversal events, and a negligible leakage treatment. However, several key items are either not stated or internally inconsistent, including the crediting period, benefit-sharing documentation, and the absence of verified issuance/claim totals, which limits confidence in the claim picture.

Project Description

Developer: Climate Bridge (Shanghai) Ltd. Type: Solar Thermal - Electricity Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2013-12-20 → 2027-12-19 Estimated annual credits: 13798 tCO2e SDGs: Goal 9: Industry, Innovation and Infrastructure, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action

Red Flags

  • The crediting period is contradictory across documents, and I privileged the later 2022-08-12 value because it is the more recent record, but the inconsistency still weakens reliability.
  • No verified or claimed emission reduction totals were provided, so over-crediting and registry-claim checks cannot be fully assessed.

Credit Vintages

Issued Retired Available
2013
248 248 0
2014
14,389 14,389 0
2015
13,795 13,795 0
2016
11,666 11,666 0
2019
4,937 98 4,839
2020
10,980 219 10,761
Total 56,015 40,415 15,600

Cosa migliorerebbe questo punteggio

  • Provide the verified and claimed emission reduction totals for the monitoring period, with registry issuance references.
  • Publish a clean, reconciled document set that resolves the crediting-period and leakage/benefit-sharing contradictions and includes the missing usage and claim details.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal events reported

Leakage

0% deduction with limited justification

Baseline

Project baseline, reassessed in 2020

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA-eligible; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti