ULUBORLU WPP
GS-606 ↗ · current registry ID: GS3493
#73of 108 in Water#242of 295 in Turkey#1109of 1801 in Gold Standard (GS)#996of 1287 in ACM0002
Audit Analysis
The Uluborlu Wind Power Plant is a Gold Standard wind project with a VVB-confirmed investment additionality test and no reversal events, but its documentation is severely undermined by over 30 corrective actions, multiple cross-document contradictions, and significant gaps in stakeholder consultation and SPP-related information. The project's core technical design is sound for a wind avoidance project, yet the volume of unresolved issues raises meaningful concerns about data reliability and process rigor.
Red Flags
- Over 30 corrective actions logged in the 2024 verification report, including missing CP1 validation report, incomplete IRR calculations, missing stakeholder consultation records, and absent SPP documentation
- Contradiction in additionality test type within the same monitoring report (2020): described as both 'investment' and 'combined'
- Baseline method contradicts between the PDD (jurisdictional, 2018) and the 2022 verification report (project-specific)
- FPIC explicitly not conducted, despite safeguards and grievance mechanism being present
- Grid emission factor sourced from 2012–2014 data, which is over a decade old at the time of the 2024 verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 42,153 | 2,153 | 40,000 | |
| 2017 | 96,495 | 96,495 | 0 | |
| 2018 | 93,492 | 93,492 | 0 | |
| 2019 | 95,481 | 95,446 | 35 | |
| 2020 | 93,888 | 93,261 | 627 | |
| 2021 | 118,946 | 118,946 | 0 | |
| 2022 | 107,565 | 78,644 | 28,921 | |
| 2023 | 46,177 | 30,650 | 15,527 | |
| Total | 694,197 | 609,087 | 85,110 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Quantified 0%, appropriate for wind
Project-specific, method contradicted across docs
Grievance present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →