Skip to main content
GSEnergy Efficiency - DomesticUgandaAMS-II.G

Up Energy Improved Cookstoves Programme, Uganda – CPA No 007

GS-2894 ↗ · current registry ID: GS10905

#804of 1329 in Industrial#98of 163 in Uganda#1200of 1801 in Gold Standard (GS)#128of 189 in AMS-II.G

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.5

Audit Analysis

The Up Energy Improved Cookstoves Programme in Uganda is a well-structured Gold Standard project under the established AMS-II.G methodology, with a quantified 5% leakage deduction and a recent (2024) baseline reassessment. However, the most recent verification report (August 2025) does not confirm VVB verification of additionality, no buffer pool is in place, and the cumulative verified emissions reductions (200,769 tCO₂e) already exceed the lifetime ex-ante estimate (113,098 tCO₂e) by roughly 77% with only about 55% of the crediting period elapsed, raising a material over-crediting concern. Numerous data inconsistencies and corrective actions across verification and monitoring reports further erode confidence in the MRV chain.

Red Flags

  • Cumulative verified ERR of 200,769 tCO₂e exceeds the lifetime ex-ante estimate of 113,098 tCO₂e by ~77% while only ~55% of the crediting period has elapsed, indicating a significant over-crediting risk.
  • The most recent verification report (Aug 2025) does not confirm VVB verification of additionality, reversing the position in the Sep 2023 verification report.
  • No buffer pool is in place to cover potential reversals from stove end-of-life, and no permanence claim period is stated.
  • FPIC status is contradictory: the validation report (Feb 2025) states FPIC was conducted, while the verification report (Jan 2025) states it was not.
  • Crediting period is inconsistent across documents: 2021-07-22 to 2027-10-20 (monitoring report, Aug 2025) versus 2024-12-05 to 2029-12-04 (validation report, Feb 2025).

Credit Vintages

IssuedRetiredAvailable
2020
35,24417,62217,622
2021
42,01842,0180
2022
50,01349,014999
2023
64,32462,1022,222
2024
59,859059,859
Total251,458170,75680,702

Risk Indicators

Additionality

Combined test conducted but VVB verification not confirmed in latest report

Permanence

stove end-of-life reversal risk unaddressed

Leakage

5% quantified deduction applied

Baseline

Project-specific baseline, reassessed 2024

Safeguards

Grievance mechanism and benefit sharing present; FPIC status contradictory

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06AMS-II.G

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents