Up Energy Improved Cookstoves Programme, Uganda – CPA No 036 supported by Republic of Korea
GS-3760 ↗ · current registry ID: GS11525
#648of 1329 in Industrial#78of 163 in Uganda#987of 1801 in Gold Standard (GS)#108of 189 in AMS-II.G
Audit Analysis
The Up Energy Improved Cookstoves project in Uganda has confirmed additionality and reasonable safeguards, but is undermined by a 5.3× discrepancy between ERR figures in different documents, multiple material findings on thermal-efficiency data inconsistencies, and an unaddressed permanence/reversal gap. The project's re-validation in 2025 with a new 5-year crediting period adds complexity to interpreting the 2022 monitoring data. Overall, the credit carries moderate over-crediting risk and data-reliability concerns.
Red Flags
- ERR figures differ by 5.3× between the 2022 verification report (600,815 tCO₂e) and the 2024 appendix (113,098 tCO₂e), indicating a major data-reliability or scope inconsistency
- Verification report lists 5 CARs and 2 CLs, including thermal-efficiency values inconsistent with the registered CPA-DD and discrepancies between the ER spreadsheet and WBT reports
- Reversal/permanence risk is explicitly 'not addressed' and no buffer pool percentage is stated in any available document
- Crediting period changed from 2014–2034 (20-year) to 2024–2029 (5-year) between validation events, complicating the interpretation of the 2022 monitoring period
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 27,160 | 27,160 | 0 | |
| Total | 27,160 | 27,160 | 0 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, reassessed 2025
FPIC, grievance, benefit sharing documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →