Up Energy Improved Cookstoves Programme, Uganda – CPA No 042 supported by Republic of Korea
GS-3765 ↗ · current registry ID: GS11531
#404of 1329 in Industrial#42of 163 in Uganda#651of 1801 in Gold Standard (GS)#78of 189 in AMS-II.G
Audit Analysis
The Up Energy Improved Cookstoves project in Uganda is a Gold Standard energy-efficiency project with VVB-verified additionality and a quantified 5% leakage deduction, but it is undermined by a severe discrepancy between the verified ERR (600,815 tCO2e for 2022) and the ex-ante lifetime estimate (113,098 tCO2e for the 2024–2029 crediting period), multiple parameter contradictions across documents, and the absence of a buffer pool. The project's safeguards and stakeholder engagement are reasonably documented, yet the ERR inconsistency and a double-counting corrective action raise material over-crediting concerns.
Red Flags
- Verified ERR of 600,815 tCO2e (2022 monitoring report) is approximately 5.3× the entire ex-ante lifetime estimate of 113,098 tCO2e for the 2024–2029 crediting period, indicating a possible scale change, data error, or over-crediting risk
- Corrective action CAR#2 explicitly requires cross-checking ICS databases to avoid double counting with an existing project, signalling a potential double-claim risk
- Usage monitoring method is contradictory: the verification report describes an annual survey while the 2024 appendix describes the method as 'assumed'
- FNRB method is inconsistent: the verification report cites a national default while the 2025 validation report cites a local field measurement
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 25,565 | 25,565 | 0 | |
| Total | 25,565 | 25,565 | 0 |
Risk Indicators
VVB-confirmed combined test
avoidance project
5% quantified deduction
Project-specific, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA/CCP unstated; double-counting CAR raised
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →