Uri II Hydroelectric Project

VCS-1424 ↗

#717of 1935 in Renewable energy#350of 975 in India#426of 1339 in Verra (VCS)#562of 1287 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.5
Documentation
4.5

Audit Analysis

The Uri II Hydroelectric Project is a grid-connected renewable energy project with a sound fundamental design (investment additionality, jurisdictional grid baseline, ACM0002 methodology), but its verification record is marred by an unusually large number of material findings, multiple VVB assessment gaps, and several cross-document contradictions. The project appears to be under-crediting relative to actual generation, which is a positive for claim safety, but the documentation and process quality issues significantly erode confidence in the overall integrity of the credit issuance.

Red Flags

  • 23+ corrective actions required across validation and verification, including the VVB failing to assess the project proponent, start date, legal compliance, and ownership as mandated by the VCS Validation Report Template
  • The additionality analysis in the validation report included an unsupported time constraint (Kyoto Protocol ratification date) in the common practice test, flagged as Finding 5
  • Calibration of export meters was not performed during the monitoring period; a conservative error factor was applied as a deviation, and calibration was not completed until May 2016
  • Inconsistencies between the Monitoring Report and the ER Worksheet regarding net electricity supplied and generation data for specific dates
  • FPIC status is contradictory: the 2017 verification report records it as not conducted, while the 2024 monitoring report records it as conducted

Credit Vintages

IssuedRetiredAvailable
2013
1,305,0891,204,917100,172
Total1,305,0891,204,917100,172

Risk Indicators

Additionality

VVB-confirmed investment test, but validation contained unsu

Permanence

Energy project – no reversal risk; not applicable

Leakage

0% deduction with 'deemed negligible' justification; reasona

Baseline

Jurisdictional grid EF (2014) per 2024 report; 2016 validati

Safeguards

Grievance mechanism present; FPIC status contradictory acros

Double-claim

CORSIA eligibility and CCP status not stated in any availabl

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002: Grid-connected electricity generation from renewable sources

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents