V-Grid (c/o South Corner Dairy)
#10of 352 in Biomass#49of 345 in United States#1of 111 in Puro.earth (PUR)
Audit Analysis
A Puro.earth biochar removal project with VVB-confirmed additionality and a verified ERR that exactly matches the claimed figure (207 tCO₂e). The project demonstrates conservative operational adjustments (carbon content revised downward, LCA updated) but leaves notable gaps in permanence mechanisms (no buffer pool stated), leakage treatment, and baseline reassessment timing. Overall a moderately well-documented removal credit with some structural transparency gaps.
Red Flags
- Leakage deduction and justification are entirely absent from the extracted record, leaving no documented treatment of displaced emissions
- Project-specific baseline with no stated reassessment date, limiting confidence in long-term baseline validity
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 349 | 349 | 0 | |
| 2023 | 33 | 33 | 0 | |
| 2024 | 351 | 351 | 0 | |
| 2025 | 80 | 80 | 0 | |
| Total | 813 | 813 | 0 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Not addressed in available documents
Project-specific, reassessment timing unknown
Mentioned but FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →