Vajrakarur Wind Power Project In Andhra Pradesh
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was assessed using an investment test and confirmed by the VVB (validation/verification documentation).
missing Monitoring/verification raised multiple CARs on ER calculations, metering/calibration evidence, and missing supporting documents, undermining confidence in quantified ERs (monitoring report, 2022-07-25).
Transparency
verified VVB is clearly identified (LGAI Technological Center, S.A. / Applus+), and the monitoring period and grid emission factor are stated (monitoring report, 2022-07-25).
missing Key headline numbers are contradictory across documents (claimed/verified ERs and crediting period), reducing registry-grade transparency (validation/monitoring reports, 2013–2022).
Claim Safety
verified The project is marked as not CORSIA-eligible, reducing aviation-claim channel risk (extracted record).
missing Over-crediting risk is elevated by contradictory ER totals and CARs on calculation errors and missing metering/calibration support (validation/monitoring reports, 2021–2022).
Documentation
verified A relatively large document set was extracted (24 documents) including PDD, monitoring, validation, and issuance records, with high extraction confidence (extracted record).
missing The monitoring/verification trail shows many corrective actions and requests for missing primary evidence (e.g., calibration certificates, invoices/JMR, PPAs), indicating documentation gaps at audit time (monitoring report, 2022-07-25).
Detailed Analysis
Integrity
Additionality appears reasonably supported because the project uses an investment test and this is confirmed by the VVB (validation/verification documentation). However, integrity is weakened by the monitoring report (2022-07-25) listing numerous corrective actions, including inconsistencies between the emission reduction calculation and the monitoring report, wrong percentage-difference calculations, and missing metering/calibration and operational evidence. Leakage is applied as a 0% deduction, but the monitoring record alternates between not addressing leakage and deeming it negligible, which is not robustly substantiated for conservative accounting (monitoring reports dated 2022-07-25 and 2022-07-12). As an avoidance renewable project, reversal risk is inherently low, but no buffer pool information is provided in the extracted record.
Transparency
The project provides basic MRV identifiers such as the VVB name, a defined monitoring period (2022-03-01 to 2022-03-30), and a stated grid emission factor of 0.8971 (monitoring report, 2022-07-25). Transparency is materially reduced by conflicting headline figures across documents, including claimed and verified emission reductions and inconsistent crediting-period dates (validation/monitoring reports, 2013–2022). The long list of CARs and requests for missing supporting documents (e.g., calibration certificates, JMR/invoices, PPAs/commissioning certificates) suggests that, at least at the time of review, the public/audit-ready evidence trail was incomplete (monitoring report, 2022-07-25).
Claim Safety
The project is explicitly marked as not CORSIA-eligible, which lowers the risk of high-impact aviation claims (extracted record). Nonetheless, claim safety is weakened by strong over-crediting signals: the extracted record shows major contradictions in emission reduction totals between validation documents and monitoring documents, and the verification team raised CARs on calculation inconsistencies and missing metering/calibration support (monitoring report, 2022-07-25; validation reports dated 2022-07-12 and 2022-07-27). Leakage treatment is also inconsistent ("not addressed" vs "deemed negligible") while still applying 0% leakage, which increases the risk that credited reductions are overstated (monitoring reports dated 2022-07-25 and 2022-07-12). CCP status is not stated in the extracted record, leaving an additional uncertainty for high-integrity claims.
Documentation
The extracted record indicates a substantial documentation base (24 documents) spanning PDD, monitoring, validation, and issuance, and the minimum extraction confidence is high, which supports a moderate documentation score (extracted record). However, the monitoring report (2022-07-25) contains extensive corrective actions and explicit requests for missing primary evidence (technical specifications, breakdown sheets, calibration certificates, JMR/invoices, PPAs, commissioning certificates, and double-counting declarations). These gaps and the need for multiple revisions (e.g., MR template alterations, editorial mistakes, unit corrections) indicate that documentation quality and completeness at audit time were uneven.
Overall
Overall quality is constrained by reliability issues in the extracted record: emission reduction totals conflict across documents, and the verification/monitoring process required many corrective actions tied to core quantification evidence (monitoring report, 2022-07-25). For contradictions, I privilege the more recent monitoring report (2022-07-25) for current process/evidence status (e.g., leakage being "not addressed" and safeguards/grievance being present) because it reflects the latest audit cycle, but I score down because earlier documents disagree (2014 monitoring report; 2013 PDD). For ER quantities, I treat the lower verified figure (3,555 in the 2022-07-27 validation/verification document) as the safer value because verified numbers should supersede claimed figures, while noting the contradiction with 59,885 in the 2022-07-12 validation document and 76,566 claimed in a 2021-08-02 monitoring document. The crediting period is also inconsistent (2012–2022 vs 2013–2023), and I privilege the later monitoring report’s stated period for what was monitored/issued in this cycle, while penalizing the inconsistency as a documentation and transparency risk.
Audit Analysis
The project is a grid-connected wind activity under ACM0002 with additionality confirmed by the VVB, but the extracted record shows major internal inconsistencies in emission reduction figures and crediting-period dates across documents. Leakage is treated as 0% yet is inconsistently justified, and the monitoring/verification trail includes numerous corrective actions and missing evidence requests, increasing over-crediting and reliability risk.
Project Description
Mytrah Vayu (Pennar) Private Limited set up a 63 MW wind power project in Andhra Pradesh, India. The project consists of 30 Wind Turbine Generators, each with a capacity of 2.1 MW, and uses Suzlon Energy Limited's indigenous S88 model WEGs, emitting zero emissions as it does not involve any fossil fuel usage or technology transfer.
Red Flags
- Large inconsistencies in reported/verified emission reductions across validation/monitoring documents (e.g., 3,555 vs 59,885 and claimed totals also conflict).
- Leakage is set to 0% while justification is inconsistent across monitoring reports ("not addressed" vs "deemed negligible").
- Safeguards and grievance mechanism are inconsistently reported over time (present in 2022 MR but absent in 2014 MR), and FPIC is contradictory between the PDD and MR.
- Extensive corrective actions cite missing core evidence (calibration certificates, JMR/invoices, PPAs/commissioning certificates) and calculation inconsistencies.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 29,759 | 29,759 | 0 | |
| 2013 | 39,012 | 39,012 | 0 | |
| 2014 | 75,811 | 75,811 | 0 | |
| 2015 | 96,684 | 96,684 | 0 | |
| 2016 | 94,381 | 94,381 | 0 | |
| 2017 | 75,629 | 75,629 | 0 | |
| 2018 | 92,133 | 92,133 | 0 | |
| 2019 | 93,241 | 93,241 | 0 | |
| 2020 | 65,641 | 65,641 | 0 | |
| 2021 | 74,192 | 31,932 | 42,260 | |
| 2022 | 10,351 | 0 | 10,351 | |
| Total | 746,834 | 694,223 | 52,611 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled ER table that ties each monitoring period to final verified issuance, explicitly resolving the conflicting ER totals and crediting-period dates across documents.
- Provide complete primary evidence packs referenced in CARs (meter calibration certificates, JMR/invoices, PPAs, commissioning certificates, turbine technical specs/breakdown logs) and a clear leakage assessment/justification consistent with ACM0002 requirements.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test confirmed by VVB
Avoidance renewable; reversal risk low
0% leakage with inconsistent justification
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC inconsistently documented
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →