Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredGeneral Methodologyv2.1

Veer (NLBC) Small Hydro Power Project

VCS-1241 ↗

#719of 1935 in Renewable energy#351of 975 in India#428of 1339 in Verra (VCS)

5.5/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.5
Documentation
4.5

Audit Analysis

The Veer (NLBC) Small Hydro Power Project is a VCS-registered renewable energy project with a sound additionality design (investment test confirmed by RINA SpA) and a jurisdictional grid-emission-factor baseline. However, the verification process surfaced numerous material findings—including a 16-month meter calibration gap, editorial errors, and missing monitoring records—that undermine confidence in the MRV chain. The project delivered roughly 133% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is consistent with weather-driven over-generation in small hydro.

Red Flags

  • Monitoring meters remained uncalibrated for approximately 16 months (Dec 2014 – Aug 2019), raising questions about the accuracy of generation data used in emission reduction calculations
  • The verification report (2023-01-24) contains an internal contradiction on baseline method, listing both 'jurisdictional' and 'project' in the same document
  • Grid emission factor differs by ~10% between the validation report (0.8895) and the monitoring report (0.9793), with no documented reconciliation
  • Nine corrective action requests were raised during verification, including missing JMRs, invoices, logbooks, and calibration certificates, indicating weak monitoring record-keeping

Credit Vintages

IssuedRetiredAvailable
2012
2,6232,6230
2013
11,56011,5600
2014
9,7732,4737,300
2015
12,07411,226848
2016
16,4115,75110,660
2018
1,8651,8650
2020
8,20108,201
2021
13,005013,005
2022
5,63005,630
Total81,14235,49845,644

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, appropriate for small hydro

Baseline

Jurisdictional but internal doc contradiction

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents