Vishnuprayag Hydro-Electric Project (Vhep) By Jaiprakash Power Ventures Ltd.(Jpvl)

VCS-173 ↗

#1443of 1935 in Renewable energy#786of 975 in India#1026of 1339 in Verra (VCS)#1107of 1287 in ACM0002

4.5/ 10
Integrity
4.5
Transparency
4.8
Claim Safety
4.5
Documentation
4.2

Audit Analysis

The Vishnuprayag hydro project is a fundamentally sound avoidance-type project with VVB-confirmed additionality and a jurisdictional grid baseline, but the verification process was marred by 14 material findings including the VVB's failure to assess deviation impacts, non-contiguous monitoring periods, and missing monthly records. The project delivered only ~57.5% of the pro-rata ex-ante expectation for the 2013–2016 monitoring window, and the grid emission factor dates from 2009, raising over-crediting concerns. Multiple cross-document contradictions further erode confidence in the data record.

Red Flags

  • The 2021 verification report lists 14 material findings, including the VVB's failure to assess the impact of project deviations on methodology, additionality, and baseline, and the absence of a statement on sufficiency and quality of evidence in the VVB conclusion.
  • The project delivered approximately 57.5% of the pro-rata ex-ante expectation for the 2013–2016 monitoring period (2,889,200 tCO2 verified vs. ~5,021,000 tCO2 expected), a significant under-delivery that may indicate the ex-ante estimate was overly optimistic or that generation was constrained.
  • The grid emission factor of 0.75 tCO2/MWh is from 2009; if India's grid has decarbonised since then, the claimed reductions are likely overstated.
  • Non-contiguous monitoring periods and missing JMRs for July–March 2014 and July–August 2015 create gaps in the emissions accounting chain.
  • The baseline method is recorded as 'jurisdictional' in the 2021 verification report but as 'project' in the 2007 verification report, an unresolved contradiction that affects baseline credibility.

Credit Vintages

IssuedRetiredAvailable
2006
608,076406,306201,770
2007
1,504,5961,301,257203,339
2008
1,212,1891,212,1890
2009
1,220,3341,145,30675,028
2010
1,497,0641,497,0640
2011
1,608,9141,608,9140
2012
1,303,5111,303,5110
2013
408,010343,80064,210
2014
1,222,7541,128,04694,708
2015
927,106663,739263,367
2016
331,330283,86347,467
Total11,843,88410,893,995949,889

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, reasonable for hydro

Baseline

Jurisdictional but grid EF from 2009; method contradiction across docs

Safeguards

FPIC conducted, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04CDM ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents