Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

VPA 6 Kilifi Borehole Rehabilitation Project

GS-1405 ↗ · current registry ID: GS7128

#26of 1329 in Industrial#5of 157 in Kenya#87of 1801 in Gold Standard (GS)

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
6.0

Audit Analysis

The Kilifi Borehole Rehabilitation Project is a Gold Standard energy-efficiency project displacing charcoal and wood for water heating, with VVB-confirmed additionality, a recently reassessed project-specific baseline, and no reversal events. However, multiple open corrective actions, contradictory leakage justifications across documents, and several unresolved data gaps (buffer pool, CORSIA/CCP status, end-use tracking) moderate confidence in the overall claim. The project delivered approximately 118% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating a reasonably conservative baseline.

Red Flags

  • Leakage justification is contradictory: the verification report (Feb 2025) states 'quantified' while the monitoring report (Feb 2025) states 'deemed negligible,' both yielding a 0% deduction — the basis for the zero deduction is not clearly documented
  • Multiple corrective actions remain open, including ensuring GHG emission reductions are not overestimated and applying conservative assumptions if required, indicating the VVB identified potential over-crediting risk
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Crediting period is inconsistent between the PDD (2014–2028, 14 years) and the verification report (2018–2023, 5 years), creating ambiguity about the true project lifetime and ex-ante ERR basis

Credit Vintages

IssuedRetiredAvailable
2018
5355350
2019
10,00010,0000
2020
7,5357,5350
2021
12,24512,2450
2022
17,66413,5324,132
2023
17,336017,336
Total65,31543,84721,468

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction with contradictory justification

Baseline

Project-specific, reassessed 2022

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents