Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Brazil Registry: RegisteredACM0002

VTRM Renewable Energy

VCS-1812 ↗

#893of 1935 in Renewable energy#59of 211 in Brazil#562of 1339 in Verra (VCS)#703of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

VTRM Renewable Energy is a multi-farm wind project in Brazil verified by RINA under ACM0002, with a solid combined additionality test and a project-specific baseline appropriate for the methodology. However, the most recent verification report (October 2025) records that FPIC was not conducted, leakage justification is absent, and benefit sharing is not described, while multiple corrective actions across reporting cycles reveal recurring data-accuracy issues. The low extraction confidence and unresolved contradictions between documents temper confidence in the overall record.

Red Flags

  • FPIC was not conducted according to the most recent verification report (Oct 2025), contradicting an earlier report that stated it was done
  • Leakage justification is recorded as 'not addressed' in the October 2025 verification report, despite a 0% deduction being applied
  • Seven corrective actions (CARs) were raised in the latest verification cycle, including incorrect energy values, missing calibration certificates, and incomplete MR sections
  • Min extraction confidence is rated low, indicating at least one key document was poorly readable
  • CORSIA eligibility and CCP status are not stated in any available document

Credit Vintages

IssuedRetiredAvailable
2016
7,1077,1070
2017
528,551528,5510
2018
1,448,5551,121,201327,354
2020
89,04989,0490
2021
370,656205,969164,687
2022
409,44264,251345,191
2023
382,112295,54786,565
2024
215,791196,35019,441
Total3,451,2632,508,025943,238

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Wind energy – no reversal risk

Leakage

0% deduction, justification absent in latest report

Baseline

Project-specific, appropriate for ACM0002; method contradict

Safeguards

Grievance mechanism present; FPIC not conducted per 2025 rep

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents