Skip to main content
GSOtherIndiaAMS-II.I

Waste Management PoA in India- Biogas for thermal applications- VPA 5

GS-3586 ↗ · current registry ID: GS11594

#87of 268 in Biogas#534of 975 in India#752of 1801 in Gold Standard (GS)#27of 72 in AMS-II.I

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard biogas-for-thermal project in India has verified additionality and no reversal events, but is undermined by three material findings (data extrapolation, a seven-month calibration gap, and a monitoring-plan deviation), eighteen corrective actions, and contradictory leakage justifications across documents. The project-specific modeled baseline and 0% leakage deduction, combined with the absence of FNRB, LCA, and feedstock-sustainability data, leave meaningful gaps in the environmental-integrity case.

Red Flags

  • Extrapolation of monitoring data from an 8.5 TPD unit to a 2.5 TPD unit was used for several parameters, a methodological shortcut flagged as a material finding in the verification report
  • Temperature and pressure gauge calibration was delayed from 10 Dec 2023 to 05 Jul 2024 (~7 months), during which monitoring data reliability is questionable
  • Leakage justification is contradictory: the verification report (Mar 2024) states 'quantified' while the monitoring report (Feb 2025) states 'deemed negligible', yet the deduction is 0% in both
  • Eighteen corrective actions were required, including errors in methodology nomenclature, CDM tool version numbers, calculated emission values, and missing monitoring parameters
  • Crediting-period start date differs between the PDD (18 Mar 2019) and the verification report (21 Mar 2022), and the verification report lists no end date

Credit Vintages Exhausted

IssuedRetiredAvailable
2022
10100
2023
6526520
Total6626620

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, contradictory justification

Baseline

Project-specific modeled, no reassessment date

Safeguards

Grievance mechanism present, no FPIC

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10AMS-III.AO, AMS-I.I

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents