West Bakr Wind Farm Project

GS-2584 ↗ · current registry ID: GS7739

#1194of 1935 in Renewable energy#8of 9 in Egypt#994of 1801 in Gold Standard (GS)#930of 1287 in ACM0002

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The West Bakr Wind Farm is a Gold Standard wind project with VVB-confirmed additionality and a conservative ERR delivery (76% of pro-rata expectation), but it is undermined by five cross-document contradictions, nine outstanding corrective actions, and a low extraction confidence rating that collectively erode confidence in the underlying data. The project's wind-energy nature limits reversal risk, yet the inconsistent baseline classification and contradictory leakage treatment introduce material uncertainty into the credit quantity.

Red Flags

  • Five contradictions across documents, including a 43,611 tCO2 discrepancy in verified ERR between the 2024 and 2025 verification reports (464,178 vs 421,567), and a baseline method conflict (project vs jurisdictional) between the 2025 verification and monitoring reports
  • Nine corrective actions remain open, including missing commissioning certificate, PPA, O&M agreement, calibration certificates for all four energy meters, and missing invoices for three months in 2022
  • Leakage justification is contradictory: the 2024 verification report states leakage was 'not addressed' while the 2025 report claims it was 'quantified,' yet the deduction remains 0%
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2021
28,88828,8880
2022
490,601360,428130,173
2023
464,1782,850461,328
2024
421,5670421,567
Total1,405,234392,1661,013,068

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – minimal reversal risk

Leakage

0% deduction with contradictory justification

Baseline

Project-specific; method contradicted across docs

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents